Greenhithe for Bluewater
GNHSouth EastManaged by Southeastern
How this station is performing
Greenhithe for Bluewater had 73,608 scheduled stops to Period 7 of 2026-27, about 202 a day. 82.5% of recorded arrivals were within three minutes of the timetable and 3.7% of scheduled stops were cancelled.
Greenhithe for Bluewater opened on 30 July 1849, 177 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Greenhithe for Bluewater is the oldest; the next oldest, Northfleet, dates from 1849.
The nearest stations to Greenhithe for Bluewater are Stone Crossing (1.1 km west), Swanscombe (2.2 km east), Ebbsfleet International (3.0 km east), Northfleet (3.1 km east) and Chafford Hundred Lakeside (3.9 km north). 22 stations lie within 10 km in all. Of the five, Chafford Hundred Lakeside is the most punctual at 88.1% and Ebbsfleet International the least at 81.2%, with Greenhithe for Bluewater on 82.5%.
Greenhithe for Bluewater is named after Greenhithe, a Village, home to about 4,700 people, but the station stands 0.2 km from its centre.
2 operators call at Greenhithe for Bluewater: Southeastern (82.0%, 65% of stops) and GTR (83.4%, 35% of stops). They are close together, with GTR leading on 83.4% and Southeastern trailing on 82.0%, a gap of 1.4 percentage points.
2 of 3 stations of a similar size in South East are more punctual than Greenhithe for Bluewater on 82.5%. The comparison group includes Rainham (Kent) (76.1%), Strood (Kent) (86.4%) and Swanley (84.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 47,956 | 82.0% | 3.0% |
| GTR | 25,652 | 83.4% | 5.1% |
Operators with their own page for this station are linked to it.
Late train at Greenhithe for Bluewater? Delay Repay
These operators call at Greenhithe for Bluewater and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,925 | 81.8% | 2.9% |
| Period 6 of 2026-27 | 5,691 | 80.3% | 3.3% |
| Period 5 of 2026-27 | 5,520 | 82.4% | 4.8% |
| Period 4 of 2026-27 | 5,748 | 85.0% | 2.9% |
| Period 3 of 2026-27 | 5,531 | 79.8% | 4.0% |
| Period 2 of 2026-27 | 5,787 | 81.7% | 6.4% |
| Period 1 of 2026-27 | 6,695 | 86.9% | 3.2% |
| Period 13 of 2025-26 | 6,193 | 84.8% | 2.2% |
| Period 12 of 2025-26 | 3,825 | 81.4% | 2.4% |
| Period 11 of 2025-26 | 5,803 | 82.4% | 3.3% |
| Period 10 of 2025-26 | 5,108 | 86.7% | 5.1% |
| Period 9 of 2025-26 | 5,789 | 78.4% | 4.7% |
| Period 8 of 2025-26 | 5,993 | 79.8% | 2.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Rainham (Kent) | 74,051 | 76.1% | 3.5% |
| Strood (Kent) | 74,087 | 86.4% | 2.8% |
| Swanley | 74,754 | 84.3% | 1.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out