ScotRail at Greenfaulds
How this operator is doing here
ScotRail had 33,449 scheduled stops at Greenfaulds in the 13 periods to Period 7 of 2026-27, 98% of the station's total. 90.5% of recorded arrivals came within three minutes and 1.1% of stops were cancelled.
ScotRail trains at Greenfaulds also serve Cumbernauld (1.1 km north-east, 87.9% on time, 1.2% cancelled), Croy (3.5 km north-west, 92.4% on time, 0.8% cancelled), Gartcosh (7.7 km south-west, 88.0% on time, 0.6% cancelled), Coatdyke (7.9 km south, 88.7% on time, 1.9% cancelled), Coatbridge Sunnyside (7.9 km south, 87.5% on time, 1.9% cancelled) and Airdrie (7.9 km south, 86.1% on time, 1.5% cancelled), which are the stations on its network closest to Greenfaulds.
Within 30 km of here, ScotRail runs best at Muirend, 22.3 km south-west (97.4%), and worst at Bargeddie, 10.6 km south-west (69.7%).
The busiest ScotRail station within 30 km of Greenfaulds is Glasgow Central, 18.6 km south-west, with about 995 scheduled stops a day.
Of the 2 operators with enough records at Greenfaulds, ScotRail is the most punctual, at 90.5%.
For ScotRail, Greenfaulds is the 100th best of 312 ranked stations. Its 90.5% here is 2.6 percentage points above the 87.9% across the whole network.
Cancellations of ScotRail at Greenfaulds are near its usual level: 1.1% of scheduled stops, against 1.6% across its network and 1.3% for every operator at the station.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,557 | 89.6% | 1.0% |
| Period 6 of 2026-27 | 2,572 | 92.0% | 0.3% |
| Period 5 of 2026-27 | 2,572 | 91.4% | 0.7% |
| Period 4 of 2026-27 | 2,497 | 90.0% | 1.8% |
| Period 3 of 2026-27 | 2,572 | 92.2% | 2.1% |
| Period 2 of 2026-27 | 2,572 | 92.7% | 1.3% |
| Period 1 of 2026-27 | 2,980 | 92.4% | 1.4% |
| Period 13 of 2025-26 | 2,807 | 92.8% | 0.6% |
| Period 12 of 2025-26 | 2,572 | 92.5% | 1.2% |
| Period 11 of 2025-26 | 2,572 | 89.9% | 0.7% |
| Period 10 of 2025-26 | 2,072 | 90.5% | 0.9% |
| Period 9 of 2025-26 | 2,552 | 85.5% | 1.4% |
| Period 8 of 2025-26 | 2,552 | 84.8% | 1.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Greenfaulds
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Lumo (West Coast) | 795 | 58.5% | 6.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out