Southeastern at Gravesend
All trains at GravesendSoutheastern across BritainSouth East
How this operator is doing here
Southeastern had 70,233 scheduled stops at Gravesend in the 13 periods to Period 7 of 2026-27, 72% of the station's total. 81.4% of recorded arrivals came within three minutes and 3.0% of stops were cancelled.
Southeastern trains at Gravesend also serve Northfleet (3.0 km west, 86.5% on time, 1.9% cancelled), Ebbsfleet International (3.2 km west, 81.2% on time, 1.7% cancelled), Swanscombe (3.9 km west, 86.1% on time, 1.8% cancelled), Meopham (6.1 km south, 79.4% on time, 2.0% cancelled), Greenhithe for Bluewater (6.1 km west, 82.0% on time, 3.0% cancelled) and Sole Street (6.5 km south, 83.2% on time, 1.7% cancelled), which are the stations on its network closest to Gravesend.
Within 30 km of here, Southeastern runs best at Sundridge Park, 24.1 km west (99.4%), and worst at Newington, 23.0 km south-east (69.0%).
The busiest Southeastern station within 30 km of Gravesend is Lewisham, 26.5 km west, with about 461 scheduled stops a day.
Of the 2 operators with enough records at Gravesend, Southeastern is the least punctual, at 81.4%.
For Southeastern, Gravesend is the 101st best of 173 ranked stations. Its 81.4% here is 2.8 percentage points below the 84.2% across the whole network.
Southeastern at Gravesend has not moved in one direction over three full railway years: 87.4% within three minutes in 2023-24, 83.5% in 2024-25 and 83.8% in 2025-26.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,542 | 80.5% | 2.2% |
| Period 6 of 2026-27 | 5,483 | 79.3% | 2.7% |
| Period 5 of 2026-27 | 5,658 | 80.9% | 4.4% |
| Period 4 of 2026-27 | 5,583 | 83.2% | 2.5% |
| Period 3 of 2026-27 | 5,638 | 75.5% | 3.8% |
| Period 2 of 2026-27 | 5,403 | 79.7% | 6.8% |
| Period 1 of 2026-27 | 6,293 | 86.3% | 2.4% |
| Period 13 of 2025-26 | 5,812 | 83.9% | 2.9% |
| Period 12 of 2025-26 | 4,210 | 84.3% | 2.1% |
| Period 11 of 2025-26 | 5,417 | 83.1% | 2.3% |
| Period 10 of 2025-26 | 4,418 | 85.4% | 2.3% |
| Period 9 of 2025-26 | 5,326 | 78.4% | 2.1% |
| Period 8 of 2025-26 | 5,450 | 78.6% | 2.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Gravesend
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 26,665 | 82.4% | 4.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out