GTR at Gravesend
How this operator is doing here
GTR had 26,665 scheduled stops at Gravesend in the 13 periods to Period 7 of 2026-27, 28% of the station's total. 82.4% of recorded arrivals came within three minutes and 4.7% of stops were cancelled.
GTR trains at Gravesend also serve Northfleet (3.0 km west, 83.2% on time, 5.1% cancelled), Swanscombe (3.9 km west, 83.3% on time, 5.1% cancelled), Greenhithe for Bluewater (6.1 km west, 83.4% on time, 5.1% cancelled), Higham (7.0 km east, 84.5% on time, 4.8% cancelled), Stone Crossing (7.3 km west, 82.6% on time, 5.1% cancelled) and Dartford (10.3 km west, 78.2% on time, 5.0% cancelled), which are the stations on its network closest to Gravesend.
Within 30 km of here, GTR runs best at Beckenham Junction, 27.4 km west (98.1%), and worst at Dartford, 10.3 km west (78.2%).
The busiest GTR station within 30 km of Gravesend is Queens Road (Peckham), 29.6 km west, with about 127 scheduled stops a day.
Of the 2 operators with enough records at Gravesend, GTR is the most punctual, at 82.4%.
For GTR, Gravesend ranks 181st of 307 stations and is typical: 82.4% here against 82.9% across the network, a difference of 0.5 percentage points.
GTR at Gravesend has not moved in one direction over three full railway years: 86.5% within three minutes in 2023-24, 83.8% in 2024-25 and 84.7% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,155 | 81.0% | 4.3% |
| Period 6 of 2026-27 | 2,038 | 78.8% | 4.4% |
| Period 5 of 2026-27 | 1,651 | 82.1% | 6.1% |
| Period 4 of 2026-27 | 2,027 | 81.8% | 3.7% |
| Period 3 of 2026-27 | 1,676 | 80.4% | 4.5% |
| Period 2 of 2026-27 | 2,048 | 82.1% | 4.4% |
| Period 1 of 2026-27 | 2,395 | 85.2% | 3.8% |
| Period 13 of 2025-26 | 2,328 | 85.4% | 2.0% |
| Period 12 of 2025-26 | 2,005 | 86.4% | 2.4% |
| Period 11 of 2025-26 | 2,090 | 82.1% | 4.5% |
| Period 10 of 2025-26 | 1,983 | 85.3% | 8.9% |
| Period 9 of 2025-26 | 2,117 | 78.7% | 8.1% |
| Period 8 of 2025-26 | 2,152 | 81.0% | 4.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Gravesend
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 70,233 | 81.4% | 3.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out