Glynde
GLYSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Glynde had 16,241 scheduled stops to Period 7 of 2026-27, about 45 a day. 87.4% of recorded arrivals were within three minutes of the timetable and 2.1% of scheduled stops were cancelled.
Glynde opened on 27 June 1846, 180 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Glynde is the oldest; the next oldest, Lewes, dates from 1846.
The nearest stations to Glynde are Southease (4.2 km south-west), Lewes (4.2 km west), Berwick (Sussex) (7.0 km east), Newhaven Town (7.2 km south) and Cooksbridge (7.5 km north-west). 8 stations lie within 10 km in all. At 87.4%, Glynde is more punctual than every one of them; the best of the five, Newhaven Town, manages 86.4%.
Glynde takes its name from a Village called Glynde, home to about 258 people, and the station stands 0.3 km from its centre.
For Glynde, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 60.7% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2025-26, at 95.6%, which is 34.9 percentage points higher.
Compared with 3 stations of a similar size in South East, Glynde is the most punctual, at 87.4%. The comparison group includes Farnborough North (79.2%), Sole Street (83.2%) and Bekesbourne (73.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 16,241 | 87.4% | 2.1% |
Operators with their own page for this station are linked to it.
Late train at Glynde? Delay Repay
These operators call at Glynde and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,210 | 83.0% | 3.8% |
| Period 6 of 2026-27 | 1,213 | 60.7% | 1.7% |
| Period 5 of 2026-27 | 1,058 | 85.3% | 3.2% |
| Period 4 of 2026-27 | 1,297 | 90.2% | 2.9% |
| Period 3 of 2026-27 | 1,298 | 87.6% | 3.9% |
| Period 2 of 2026-27 | 1,258 | 85.6% | 2.7% |
| Period 1 of 2026-27 | 1,434 | 92.3% | 1.9% |
| Period 13 of 2025-26 | 1,390 | 93.7% | 1.4% |
| Period 12 of 2025-26 | 1,286 | 93.0% | 1.1% |
| Period 11 of 2025-26 | 1,272 | 90.2% | 1.2% |
| Period 10 of 2025-26 | 1,026 | 91.2% | 0.5% |
| Period 9 of 2025-26 | 1,262 | 90.5% | 0.9% |
| Period 8 of 2025-26 | 1,237 | 89.9% | 2.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Farnborough North | 16,233 | 79.2% | 6.1% |
| Sole Street | 16,275 | 83.2% | 1.7% |
| Bekesbourne | 16,314 | 73.6% | 1.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out