Farnborough North
FNNSouth EastManaged by Great Western Railway
How this station is performing
Farnborough North had 16,233 scheduled stops to Period 7 of 2026-27, about 45 a day. 79.2% of recorded arrivals were within three minutes of the timetable and 6.1% of scheduled stops were cancelled.
Farnborough North opened on 4 July 1849, 177 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Farnborough (Main) is the oldest (1838) and Camberley the newest (1878), with Farnborough North in between.
The nearest stations to Farnborough North are Farnborough (Main) (1.1 km south-west), Frimley (1.1 km north), North Camp (3.1 km south), Ash Vale (3.6 km south-east) and Camberley (3.8 km north). 14 stations lie within 10 km in all. At 79.2%, Farnborough North is less punctual than all of them; the best of the five, Frimley, manages 96.7%.
Farnborough North is named after Farnborough, a town, home to about 65,034 people, but the station stands 1.5 km from its centre.
Across the whole run of data, the weakest four-week period for Farnborough North was Period 9 of 2024-25, at 56.2%, some time before the latest year. The strongest was Period 2 of 2023-24, at 94.0%, and the two are 37.8 percentage points apart. Cancellations peaked at 12.4% of scheduled stops in Period 9 of 2024-25, against 6.1% over the latest 13 periods.
2 of 3 stations of a similar size in South East are more punctual than Farnborough North on 79.2%. The comparison group includes Glynde (87.4%), Sole Street (83.2%) and Bekesbourne (73.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 16,233 | 79.2% | 6.1% |
Operators with their own page for this station are linked to it.
Late train at Farnborough North? Delay Repay
These operators call at Farnborough North and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,264 | 71.9% | 3.7% |
| Period 6 of 2026-27 | 1,265 | 73.0% | 8.0% |
| Period 5 of 2026-27 | 1,264 | 74.5% | 7.5% |
| Period 4 of 2026-27 | 1,265 | 78.2% | 8.9% |
| Period 3 of 2026-27 | 1,236 | 80.9% | 8.1% |
| Period 2 of 2026-27 | 1,256 | 86.5% | 4.7% |
| Period 1 of 2026-27 | 1,427 | 85.0% | 4.1% |
| Period 13 of 2025-26 | 1,343 | 89.1% | 3.4% |
| Period 12 of 2025-26 | 1,213 | 86.2% | 4.9% |
| Period 11 of 2025-26 | 1,246 | 87.8% | 5.1% |
| Period 10 of 2025-26 | 1,108 | 78.1% | 8.5% |
| Period 9 of 2025-26 | 1,147 | 69.5% | 5.3% |
| Period 8 of 2025-26 | 1,199 | 64.8% | 7.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Glynde | 16,241 | 87.4% | 2.1% |
| Sole Street | 16,275 | 83.2% | 1.7% |
| Bekesbourne | 16,314 | 73.6% | 1.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out