ScotRail at Glasgow Central
All trains at Glasgow CentralScotRail across BritainScotland
How this operator is doing here
ScotRail had 362,184 scheduled stops at Glasgow Central in the 13 periods to Period 7 of 2026-27, 94% of the station's total. 88.9% of recorded arrivals came within three minutes and 1.4% of stops were cancelled.
ScotRail trains at Glasgow Central also serve Argyle Street (0.5 km east, 84.8% on time, 1.6% cancelled), Glasgow Queen Street (0.7 km north-east, 86.8% on time, 1.1% cancelled), Anderston (0.8 km west, 84.2% on time, 1.8% cancelled), Charing Cross (Glasgow) (1.0 km north-west, 87.2% on time, 1.5% cancelled), High Street (Glasgow) (1.2 km east, 87.5% on time, 1.7% cancelled) and Exhibition Centre (Glasgow) (1.6 km west, 84.9% on time, 1.9% cancelled), which are the stations on its network closest to Glasgow Central.
Within 30 km of here, ScotRail runs best at Neilston, 13.5 km south-west (97.6%), and worst at Bargeddie, 11.6 km east (69.7%).
The busiest ScotRail station within 30 km of Glasgow Central is Glasgow Queen Street, 0.7 km north-east, with about 549 scheduled stops a day.
Of the 4 operators with enough records at Glasgow Central, ScotRail is the most punctual, at 88.9%.
For ScotRail, Glasgow Central is the 129th best of 312 ranked stations. Its 88.9% here is 1.0 percentage points above the 87.9% across the whole network.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 28,562 | 87.8% | 1.1% |
| Period 6 of 2026-27 | 28,479 | 90.9% | 0.6% |
| Period 5 of 2026-27 | 28,020 | 89.5% | 0.9% |
| Period 4 of 2026-27 | 28,567 | 89.3% | 1.6% |
| Period 3 of 2026-27 | 28,641 | 90.1% | 2.1% |
| Period 2 of 2026-27 | 27,985 | 89.8% | 1.2% |
| Period 1 of 2026-27 | 32,719 | 90.2% | 1.7% |
| Period 13 of 2025-26 | 19,797 | 90.2% | 1.8% |
| Period 12 of 2025-26 | 28,531 | 90.8% | 1.2% |
| Period 11 of 2025-26 | 28,693 | 90.3% | 0.6% |
| Period 10 of 2025-26 | 25,196 | 87.3% | 1.4% |
| Period 9 of 2025-26 | 28,489 | 84.0% | 3.2% |
| Period 8 of 2025-26 | 28,505 | 85.2% | 1.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Glasgow Central
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Avanti | 13,730 | 64.7% | 5.5% |
| TransPennine Express | 6,471 | 76.9% | 5.6% |
| CrossCountry | 1,624 | 77.2% | 8.2% |
| Caledonian Sleeper | 600 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out