Giggleswick
GIGYorkshire and The HumberManaged by Northern Trains
How this station is performing
Giggleswick has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 5,518 scheduled stops, about 15 a day. In those periods 82.2% of stops arrived within three minutes of the timetable and 0.9% of scheduled stops were cancelled.
Giggleswick opened on 30 July 1849, 177 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Giggleswick is the oldest; the next oldest, Long Preston, dates from 1849.
The nearest stations to Giggleswick are Settle (1.5 km east), Long Preston (5.9 km south-east), Hellifield (7.5 km south-east), Clapham (North Yorkshire) (8.5 km north-west) and Horton-in-Ribblesdale (9.7 km north). 5 stations lie within 10 km in all. At 82.2%, Giggleswick is more punctual than every one of them; the best of the five, Clapham (North Yorkshire), manages 82.0%.
Giggleswick takes its name from a Village called Giggleswick, home to about 1,407 people, and the station stands 1.6 km from its centre.
Compared with 3 stations of a similar size in Yorkshire and The Humber, Giggleswick is the most punctual, at 82.2%. The comparison group includes Bentham (82.1%), Clapham (North Yorkshire) (82.0%) and Grimsby Docks (79.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 5,518 | 82.2% | 0.9% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 424 | 82.5% | 0.5% |
| Period 6 of 2026-27 | 424 | 79.9% | 0.5% |
| Period 5 of 2026-27 | 424 | 83.2% | 0.5% |
| Period 4 of 2026-27 | 424 | 80.7% | 0.9% |
| Period 3 of 2026-27 | 424 | 82.1% | 0.5% |
| Period 2 of 2026-27 | 424 | 82.6% | 0.5% |
| Period 1 of 2026-27 | 452 | – | 0.0% |
| Period 13 of 2025-26 | 466 | 90.8% | 2.1% |
| Period 12 of 2025-26 | 424 | 88.4% | 0.2% |
| Period 11 of 2025-26 | 424 | 90.1% | 1.9% |
| Period 10 of 2025-26 | 360 | 83.5% | 1.1% |
| Period 9 of 2025-26 | 424 | 72.6% | 1.9% |
| Period 8 of 2025-26 | 424 | 69.1% | 0.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bentham | 5,518 | 82.1% | 0.9% |
| Clapham (North Yorkshire) | 5,518 | 82.0% | 0.9% |
| Grimsby Docks | 5,515 | 79.2% | 3.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out