Bentham
BENYorkshire and The HumberManaged by Northern Trains
How this station is performing
Bentham has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 5,518 scheduled stops, about 15 a day. In those periods 82.1% of stops arrived within three minutes of the timetable and 0.9% of scheduled stops were cancelled.
Bentham opened on 1 June 1850, 176 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Wennington is the oldest (1849) and Horton-in-Ribblesdale the newest (1876), with Bentham in between.
The nearest stations to Bentham are Wennington (5.1 km west), Clapham (North Yorkshire) (6.7 km east), Ribblehead (14.0 km north-east), Horton-in-Ribblesdale (14.1 km east) and Giggleswick (14.9 km south-east). 2 stations lie within 10 km in all. Of the five, Wennington is the most punctual at 83.4% and Ribblehead the least at 75.8%, with Bentham on 82.1%.
Bentham is one of 3 stations named after a market town called Bentham, home to about 3,032 people; this one stands 0.3 km from its centre.
1 of 3 stations of a similar size in Yorkshire and The Humber are more punctual than Bentham on 82.1%. The comparison group includes Clapham (North Yorkshire) (82.0%), Giggleswick (82.2%) and Grimsby Docks (79.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 5,518 | 82.1% | 0.9% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 424 | 84.4% | 0.5% |
| Period 6 of 2026-27 | 424 | 82.1% | 0.5% |
| Period 5 of 2026-27 | 424 | 85.6% | 0.5% |
| Period 4 of 2026-27 | 424 | 84.0% | 0.9% |
| Period 3 of 2026-27 | 424 | 84.0% | 0.5% |
| Period 2 of 2026-27 | 424 | 82.9% | 0.5% |
| Period 1 of 2026-27 | 452 | – | 0.0% |
| Period 13 of 2025-26 | 466 | 88.9% | 2.1% |
| Period 12 of 2025-26 | 424 | 85.8% | 0.2% |
| Period 11 of 2025-26 | 424 | 88.8% | 1.9% |
| Period 10 of 2025-26 | 360 | 80.4% | 1.1% |
| Period 9 of 2025-26 | 424 | 70.2% | 1.9% |
| Period 8 of 2025-26 | 424 | 66.8% | 0.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Clapham (North Yorkshire) | 5,518 | 82.0% | 0.9% |
| Giggleswick | 5,518 | 82.2% | 0.9% |
| Grimsby Docks | 5,515 | 79.2% | 3.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out