Gatwick Airport
GTWSouth EastManaged by Govia Thameslink Railway (Gatwick Express)
How this station is performing
Gatwick Airport had 225,276 scheduled stops to Period 7 of 2026-27, about 619 a day. 71.6% of recorded arrivals were within three minutes of the timetable and 5.3% of scheduled stops were cancelled.
Gatwick Airport opened on 7 October 1891 and closed to passengers on 23 July 1949. It reopened on 28 May 1958, 68 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Horley is the oldest (1841) and Salfords (Surrey) the newest (1932), with Gatwick Airport in between.
The nearest stations to Gatwick Airport are Horley (1.4 km north), Three Bridges (4.3 km south), Salfords (Surrey) (5.0 km north), Crawley (5.3 km south) and Ifield (5.9 km south-west). 10 stations lie within 10 km in all. At 71.6%, Gatwick Airport is less punctual than all of them; the best of the five, Ifield, manages 80.9%.
2 operators call at Gatwick Airport: GTR (71.2%, 90% of stops) and Great Western Railway (75.0%, 10% of stops). They are close together, with Great Western Railway leading on 75.0% and GTR trailing on 71.2%, a gap of 3.8 percentage points.
Compared with 3 stations of a similar size in South East, Gatwick Airport is the least punctual, at 71.6%. All of them are ahead, including Reading (74.5%), Brighton (82.3%) and Woking (73.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 202,328 | 71.2% | 4.7% |
| Great Western Railway | 22,948 | 75.0% | 10.2% |
Operators with their own page for this station are linked to it.
Late train at Gatwick Airport? Delay Repay
These operators call at Gatwick Airport and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 17,109 | 67.1% | 4.0% |
| Period 6 of 2026-27 | 16,510 | 55.1% | 7.5% |
| Period 5 of 2026-27 | 16,854 | 60.6% | 7.1% |
| Period 4 of 2026-27 | 17,564 | 67.5% | 7.4% |
| Period 3 of 2026-27 | 16,539 | 71.9% | 5.6% |
| Period 2 of 2026-27 | 17,440 | 78.2% | 4.9% |
| Period 1 of 2026-27 | 20,035 | 81.1% | 3.7% |
| Period 13 of 2025-26 | 19,345 | 81.9% | 2.7% |
| Period 12 of 2025-26 | 17,593 | 75.7% | 4.8% |
| Period 11 of 2025-26 | 15,573 | 73.1% | 4.0% |
| Period 10 of 2025-26 | 15,880 | 75.8% | 4.4% |
| Period 9 of 2025-26 | 17,407 | 65.0% | 7.2% |
| Period 8 of 2025-26 | 17,427 | 72.6% | 6.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East