Great Western Railway at Gatwick Airport
All trains at Gatwick AirportGreat Western Railway across BritainSouth East
How this operator is doing here
Great Western Railway had 22,948 scheduled stops at Gatwick Airport in the 13 periods to Period 7 of 2026-27, 10% of the station's total. 75.0% of recorded arrivals came within three minutes and 10.2% of stops were cancelled.
Great Western Railway trains at Gatwick Airport also serve Redhill (9.3 km north, 76.9% on time, 8.0% cancelled), Reigate (9.9 km north, 77.2% on time, 6.1% cancelled), Betchworth (12.6 km north-west, 79.2% on time, 6.5% cancelled), Dorking (Deepdene) (14.6 km north-west, 77.8% on time, 6.1% cancelled), Dorking West (15.3 km north-west, 81.2% on time, 6.5% cancelled) and Gomshall (20.8 km west, 79.6% on time, 6.5% cancelled), which are the stations on its network closest to Gatwick Airport.
Within 30 km of here, Great Western Railway runs best at Dorking West, 15.3 km north-west (81.2%), and worst at Redhill, 9.3 km north (76.9%).
The busiest Great Western Railway station within 30 km of Gatwick Airport is Redhill, 9.3 km north, with about 68 scheduled stops a day.
Of the 2 operators with enough records at Gatwick Airport, Great Western Railway is the most punctual, at 75.0%.
For Great Western Railway, Gatwick Airport is the 117th best of 210 ranked stations. Its 75.0% here is 0.7 percentage points below the 75.7% across the whole network.
Period by period
See how Great Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,708 | 69.5% | 7.2% |
| Period 6 of 2026-27 | 1,795 | 71.1% | 17.2% |
| Period 5 of 2026-27 | 1,880 | 65.2% | 10.5% |
| Period 4 of 2026-27 | 1,866 | 71.7% | 11.6% |
| Period 3 of 2026-27 | 1,732 | 72.3% | 12.0% |
| Period 2 of 2026-27 | 1,817 | 81.4% | 8.4% |
| Period 1 of 2026-27 | 2,053 | 79.9% | 8.7% |
| Period 13 of 2025-26 | 1,957 | 82.9% | 4.8% |
| Period 12 of 2025-26 | 1,821 | 82.9% | 9.7% |
| Period 11 of 2025-26 | 1,388 | 77.2% | 7.9% |
| Period 10 of 2025-26 | 1,606 | 77.5% | 10.5% |
| Period 9 of 2025-26 | 1,669 | 70.1% | 10.9% |
| Period 8 of 2025-26 | 1,656 | 71.2% | 13.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Gatwick Airport
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 202,328 | 71.2% | 4.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out