Frant
FRTSouth EastManaged by Southeastern
How this station is performing
Frant had 16,636 scheduled stops to Period 7 of 2026-27, about 46 a day. 75.1% of recorded arrivals were within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
Frant opened on 2 July 1851, 175 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Tonbridge is the oldest (1842) and High Brooms the newest (1893), with Frant in between.
The nearest stations to Frant are Tunbridge Wells (3.6 km north-west), Wadhurst (3.7 km south), High Brooms (5.2 km north), Eridge (6.8 km west) and Tonbridge (9.8 km north). 6 stations lie within 10 km in all. Of the five, Tonbridge is the most punctual at 76.2% and High Brooms the least at 73.0%, with Frant on 75.1%.
Frant takes its name from a Village called Frant, home to about 1,645 people, and the station stands 1.8 km from its centre.
For Frant, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 54.6% of stops arrived within three minutes of the timetable. The strongest was Period 2 of 2024-25, at 85.5%, which is 30.9 percentage points higher. Cancellations peaked at 7.0% of scheduled stops in Period 10 of 2023-24, against 1.8% over the latest 13 periods.
Compared with 3 stations of a similar size in South East, Frant is the least punctual, at 75.1%. All of them are ahead, including Wye (77.6%), Chartham (80.9%) and Chilham (80.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 16,636 | 75.1% | 1.8% |
Operators with their own page for this station are linked to it.
Late train at Frant? Delay Repay
These operators call at Frant and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,219 | 60.8% | 2.2% |
| Period 6 of 2026-27 | 1,275 | 54.6% | 1.9% |
| Period 5 of 2026-27 | 1,332 | 74.6% | 1.9% |
| Period 4 of 2026-27 | 1,286 | 80.9% | 0.3% |
| Period 3 of 2026-27 | 1,251 | 80.0% | 2.3% |
| Period 2 of 2026-27 | 1,310 | 78.5% | 2.7% |
| Period 1 of 2026-27 | 1,463 | 84.3% | 0.8% |
| Period 13 of 2025-26 | 1,515 | 81.4% | 0.6% |
| Period 12 of 2025-26 | 1,328 | 81.8% | 1.1% |
| Period 11 of 2025-26 | 1,258 | 79.5% | 2.5% |
| Period 10 of 2025-26 | 1,112 | 71.7% | 3.3% |
| Period 9 of 2025-26 | 1,298 | 69.1% | 2.5% |
| Period 8 of 2025-26 | 989 | 73.2% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out