Forsinard
FRSScotlandManaged by ScotRail
How this station is performing
Forsinard has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 2,429 scheduled stops, about 7 a day. In those periods 78.8% of stops arrived within three minutes of the timetable and 4.2% of scheduled stops were cancelled.
Forsinard opened on 28 July 1874, 152 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Forsinard is the newest; the oldest, Helmsdale, opened in 1871.
Forsinard is remote: its nearest neighbours are Kinbrace (11.3 km south), Altnabreac (11.6 km east), Kildonan (20.8 km south), Scotscalder (24.5 km north-east) and Helmsdale (30.0 km south-east).
Forsinard takes its name from a settlement called Forsinard, and the station stands 0.4 km from its centre.
Forsinard improved sharply over the past year. In the latest 13 periods 78.8% of stops came within three minutes of the timetable, up 11.5 percentage points from 67.3% in the 13 before. Cancellations rose to 4.2% of scheduled stops from 2.4%, which is 1.8 percentage points more.
1 of 3 stations of a similar size in Scotland are more punctual than Forsinard on 78.8%. The comparison group includes Wick (84.3%), Brora (67.4%) and Helmsdale (73.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 2,429 | 78.8% | 4.2% |
Operators with their own page for this station are linked to it.
Late train at Forsinard? Delay Repay
These operators call at Forsinard and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 199 | 78.1% | 1.0% |
| Period 6 of 2026-27 | 200 | 81.9% | 2.0% |
| Period 5 of 2026-27 | 198 | 83.0% | 7.6% |
| Period 4 of 2026-27 | 196 | 79.3% | 6.1% |
| Period 3 of 2026-27 | 51 | – | – |
| Period 2 of 2026-27 | 200 | 77.9% | 1.5% |
| Period 1 of 2026-27 | 230 | 86.2% | 1.7% |
| Period 13 of 2025-26 | 215 | 82.1% | 3.3% |
| Period 12 of 2025-26 | 200 | 84.9% | 3.5% |
| Period 11 of 2025-26 | 178 | 72.6% | 10.7% |
| Period 10 of 2025-26 | 168 | 79.2% | 4.8% |
| Period 9 of 2025-26 | 197 | 75.4% | 7.1% |
| Period 8 of 2025-26 | 197 | 63.0% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out