GTR at Flitwick
How this operator is doing here
GTR had 54,206 scheduled stops at Flitwick in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 83.8% of recorded arrivals came within three minutes and 6.0% of stops were cancelled.
GTR trains at Flitwick also serve Harlington (Bedfordshire) (4.7 km south, 84.6% on time, 6.1% cancelled), Leagrave (11.2 km south, 85.5% on time, 6.1% cancelled), Luton (14.6 km south, 82.8% on time, 5.1% cancelled), Bedford (14.8 km north, 85.1% on time, 4.9% cancelled), Arlesey (15.9 km east, 85.6% on time, 6.3% cancelled) and Luton Airport Parkway (16.0 km south-east, 79.5% on time, 5.1% cancelled), which are the stations on its network closest to Flitwick.
Within 30 km of here, GTR runs best at Arlesey, 15.9 km east (85.6%), and worst at Letchworth Garden City, 18.4 km east (72.5%).
The busiest GTR station within 30 km of Flitwick is Stevenage, 22.7 km south-east, with about 285 scheduled stops a day.
Of the 1 operators with enough records at Flitwick, GTR is the most punctual, at 83.8%.
For GTR, Flitwick is the 151st best of 307 ranked stations. Its 83.8% here is 0.9 percentage points above the 82.9% across the whole network.
Cancellations of GTR at Flitwick are near its usual level: 6.0% of scheduled stops, against 4.7% across its network and 6.0% for every operator at the station.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,371 | 81.8% | 4.3% |
| Period 6 of 2026-27 | 4,251 | 78.6% | 7.2% |
| Period 5 of 2026-27 | 4,196 | 78.0% | 9.5% |
| Period 4 of 2026-27 | 4,181 | 78.7% | 8.2% |
| Period 3 of 2026-27 | 3,018 | 85.6% | 4.5% |
| Period 2 of 2026-27 | 3,839 | 87.9% | 3.8% |
| Period 1 of 2026-27 | 4,650 | 88.6% | 3.8% |
| Period 13 of 2025-26 | 4,760 | 86.3% | 3.7% |
| Period 12 of 2025-26 | 4,384 | 86.7% | 6.8% |
| Period 11 of 2025-26 | 4,334 | 84.4% | 5.6% |
| Period 10 of 2025-26 | 3,830 | 86.6% | 6.1% |
| Period 9 of 2025-26 | 4,222 | 80.8% | 9.9% |
| Period 8 of 2025-26 | 4,170 | 84.9% | 4.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Flitwick
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 5 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out