Flitwick
FLTEast of EnglandManaged by Govia Thameslink Railway (Thameslink)
How this station is performing
Flitwick had 54,211 scheduled stops to Period 7 of 2026-27, about 149 a day. 83.8% of recorded arrivals were within three minutes of the timetable and 6.0% of scheduled stops were cancelled.
Flitwick opened on 2 May 1870, 156 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Lidlington is the oldest (1846) and Stewartby the newest (1905), with Flitwick in between.
The nearest stations to Flitwick are Harlington (Bedfordshire) (4.7 km south), Lidlington (6.1 km north-west), Millbrook (Bedfordshire) (6.2 km north-west), Ridgmont (7.3 km west) and Stewartby (7.5 km north). 7 stations lie within 10 km in all. At 83.8%, Flitwick is less punctual than all of them; the best of the five, Lidlington, manages 93.9%.
Flitwick takes its name from a town called Flitwick, home to about 13,661 people, and the station stands 0.1 km from its centre.
Cancellations are a particular problem at Flitwick. 6.0% of scheduled stops did not happen, 2.2 times the national median of 2.7%. Ranked from fewest cancellations to most, the station is 2249th of 2,374.
Compared with 3 stations of a similar size in East of England, Flitwick is the least punctual, at 83.8%. All of them are ahead, including Laindon (91.9%), Leagrave (85.5%) and Wickford (91.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 54,206 | 83.8% | 6.0% |
| East Midlands Railway | 5 | – | – |
Operators with their own page for this station are linked to it.
Late train at Flitwick? Delay Repay
These operators call at Flitwick and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,371 | 81.8% | 4.3% |
| Period 6 of 2026-27 | 4,252 | 78.6% | 7.2% |
| Period 5 of 2026-27 | 4,196 | 78.0% | 9.5% |
| Period 4 of 2026-27 | 4,181 | 78.7% | 8.2% |
| Period 3 of 2026-27 | 3,020 | 85.6% | 4.5% |
| Period 2 of 2026-27 | 3,839 | 87.9% | 3.8% |
| Period 1 of 2026-27 | 4,650 | 88.6% | 3.8% |
| Period 13 of 2025-26 | 4,762 | 86.3% | 3.7% |
| Period 12 of 2025-26 | 4,384 | 86.7% | 6.8% |
| Period 11 of 2025-26 | 4,334 | 84.4% | 5.6% |
| Period 10 of 2025-26 | 3,830 | 86.6% | 6.1% |
| Period 9 of 2025-26 | 4,222 | 80.8% | 9.9% |
| Period 8 of 2025-26 | 4,170 | 84.9% | 4.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out