Fishguard Harbour
FGHWalesManaged by TfW Rail
How this station is performing
Fishguard Harbour had 4,597 scheduled stops to Period 7 of 2026-27, about 13 a day. 80.8% of recorded arrivals were within three minutes of the timetable and 4.4% of scheduled stops were cancelled.
Fishguard Harbour opened on 30 August 1906, 120 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Fishguard Harbour is the newest; the oldest, Clarbeston Road, opened in 1854.
The nearest stations to Fishguard Harbour are Fishguard and Goodwick (1.0 km south-west), Clarbeston Road (19.1 km south), Haverfordwest (23.2 km south), Clunderwen (25.8 km south-east) and Johnston (Pembs) (28.3 km south). 1 stations lie within 10 km in all. At 80.8%, Fishguard Harbour is more punctual than every one of them; the best of the five, Johnston (Pembs), manages 80.3%.
Fishguard Harbour is named after Fishguard, a town, home to about 3,400 people, but the station stands 1.4 km from its centre.
Across the whole run of data, the weakest four-week period for Fishguard Harbour was Period 9 of 2023-24, at 60.9%, some time before the latest year. The strongest was Period 3 of 2024-25, at 91.7%, and the two are 30.8 percentage points apart. Cancellations peaked at 12.9% of scheduled stops in Period 1 of 2023-24, against 4.4% over the latest 13 periods.
2 of 3 stations of a similar size in Wales are more punctual than Fishguard Harbour on 80.8%. The comparison group includes Fishguard and Goodwick (80.2%), Criccieth (89.3%) and Minffordd (84.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 4,597 | 80.8% | 4.4% |
Operators with their own page for this station are linked to it.
Late train at Fishguard Harbour? Delay Repay
These operators call at Fishguard Harbour and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 360 | 80.3% | 3.9% |
| Period 6 of 2026-27 | 286 | 83.4% | 1.0% |
| Period 5 of 2026-27 | 394 | 78.9% | 6.1% |
| Period 4 of 2026-27 | 360 | 77.0% | 5.8% |
| Period 3 of 2026-27 | 360 | 80.7% | 3.6% |
| Period 2 of 2026-27 | 360 | 86.5% | 9.2% |
| Period 1 of 2026-27 | 416 | 78.6% | 2.4% |
| Period 13 of 2025-26 | 394 | 81.8% | 2.5% |
| Period 12 of 2025-26 | 360 | 88.5% | 1.4% |
| Period 11 of 2025-26 | 336 | 88.8% | 4.8% |
| Period 10 of 2025-26 | 323 | 83.0% | 5.0% |
| Period 9 of 2025-26 | 350 | 65.9% | 7.7% |
| Period 8 of 2025-26 | 298 | 77.7% | 3.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Fishguard and Goodwick | 4,597 | 80.2% | 4.4% |
| Criccieth | 5,355 | 89.3% | 1.8% |
| Minffordd | 5,355 | 84.6% | 1.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out