Minffordd
MFFWalesManaged by TfW Rail
How this station is performing
Minffordd has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 5,355 scheduled stops, about 15 a day. In those periods 84.6% of stops arrived within three minutes of the timetable and 1.4% of scheduled stops were cancelled.
Minffordd opened on 1 August 1872, 154 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Penrhyndeudraeth is the oldest (1867) and Llandecwyn the newest (1935), with Minffordd in between.
The nearest stations to Minffordd are Penrhyndeudraeth (1.4 km east), Llandecwyn (2.0 km east), Talsarnau (2.7 km south-east), Porthmadog (3.4 km west) and Tygwyn (3.6 km south). 6 stations lie within 10 km in all. Of the five, Porthmadog is the most punctual at 88.6% and Penrhyndeudraeth the least at 83.7%, with Minffordd on 84.6%.
Minffordd is one of 2 stations named after a Village called Minffordd; this one stands 0.2 km from its centre.
Across the whole run of data, the weakest four-week period for Minffordd was Period 5 of 2024-25, at 65.8%, some time before the latest year. The strongest was Period 11 of 2025-26, at 93.5%, and the two are 27.7 percentage points apart.
2 of 3 stations of a similar size in Wales are more punctual than Minffordd on 84.6%. The comparison group includes Criccieth (89.3%), Penrhyndeudraeth (83.7%) and Porthmadog (88.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 5,355 | 84.6% | 1.4% |
Operators with their own page for this station are linked to it.
Late train at Minffordd? Delay Repay
These operators call at Minffordd and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 424 | 85.7% | 0.7% |
| Period 6 of 2026-27 | 430 | 84.5% | 1.4% |
| Period 5 of 2026-27 | 427 | 73.4% | 3.0% |
| Period 4 of 2026-27 | 426 | – | 2.3% |
| Period 3 of 2026-27 | 424 | 76.0% | 2.6% |
| Period 2 of 2026-27 | 357 | 82.8% | 0.3% |
| Period 1 of 2026-27 | 487 | 88.3% | 1.0% |
| Period 13 of 2025-26 | 466 | 84.0% | 0.4% |
| Period 12 of 2025-26 | 287 | 90.8% | 0.3% |
| Period 11 of 2025-26 | 392 | 93.5% | 1.0% |
| Period 10 of 2025-26 | 387 | 90.2% | 2.1% |
| Period 9 of 2025-26 | 424 | 87.7% | 1.4% |
| Period 8 of 2025-26 | 424 | 78.4% | 0.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Criccieth | 5,355 | 89.3% | 1.8% |
| Penrhyndeudraeth | 5,355 | 83.7% | 1.4% |
| Porthmadog | 5,355 | 88.6% | 1.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out