Criccieth
CCCWalesManaged by TfW Rail
How this station is performing
Criccieth had 5,355 scheduled stops to Period 7 of 2026-27, about 15 a day. 89.3% of recorded arrivals were within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
Criccieth opened on 20 September 1867, 159 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Criccieth is the oldest; the next oldest, Porthmadog, dates from 1867.
The nearest stations to Criccieth are Porthmadog (7.0 km east), Penychain (7.0 km west), Abererch (9.5 km west), Minffordd (10.2 km east) and Harlech (10.7 km south-east). 3 stations lie within 10 km in all. At 89.3%, Criccieth is more punctual than every one of them; the best of the five, Porthmadog, manages 88.6%.
Criccieth takes its name from a town called Criccieth, home to about 1,826 people, and the station stands 0.2 km from its centre.
Across the whole run of data, the weakest four-week period for Criccieth was Period 5 of 2024-25, at 75.6%, some time before the latest year. The strongest was Period 10 of 2025-26, at 95.8%, and the two are 20.2 percentage points apart.
Compared with 3 stations of a similar size in Wales, Criccieth is the most punctual, at 89.3%. The comparison group includes Minffordd (84.6%), Penrhyndeudraeth (83.7%) and Porthmadog (88.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 5,355 | 89.3% | 1.8% |
Operators with their own page for this station are linked to it.
Late train at Criccieth? Delay Repay
These operators call at Criccieth and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 424 | 90.5% | 0.7% |
| Period 6 of 2026-27 | 430 | 86.8% | 1.4% |
| Period 5 of 2026-27 | 427 | 81.4% | 4.4% |
| Period 4 of 2026-27 | 426 | 83.0% | 2.8% |
| Period 3 of 2026-27 | 424 | 87.1% | 2.6% |
| Period 2 of 2026-27 | 357 | 90.0% | 1.7% |
| Period 1 of 2026-27 | 487 | 92.8% | 1.0% |
| Period 13 of 2025-26 | 466 | 88.6% | 0.4% |
| Period 12 of 2025-26 | 287 | 92.5% | 0.0% |
| Period 11 of 2025-26 | 392 | 94.8% | 1.0% |
| Period 10 of 2025-26 | 387 | 95.8% | 2.1% |
| Period 9 of 2025-26 | 424 | 89.3% | 2.4% |
| Period 8 of 2025-26 | 424 | 85.4% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Minffordd | 5,355 | 84.6% | 1.4% |
| Penrhyndeudraeth | 5,355 | 83.7% | 1.4% |
| Porthmadog | 5,355 | 88.6% | 1.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out