Fishersgate
FSGSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Fishersgate had 17,939 scheduled stops to Period 7 of 2026-27, about 49 a day. 84.7% of recorded arrivals were within three minutes of the timetable and 2.4% of scheduled stops were cancelled.
Fishersgate opened on 3 September 1905, 121 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Fishersgate is the newest; the oldest, Portslade, opened in 1840.
The nearest stations to Fishersgate are Portslade (1.0 km east), Southwick (1.3 km west), Aldrington (2.6 km east), Hove (3.4 km east) and Shoreham-by-Sea (3.7 km west). 12 stations lie within 10 km in all. At 84.7%, Fishersgate is more punctual than every one of them; the best of the five, Aldrington, manages 83.7%.
Fishersgate has slipped a little, from 88.0% within three minutes in the previous 13 periods to 84.7% in the latest 13, a fall of 3.3 percentage points. Cancellations held steady at 2.4% of scheduled stops, against 2.2% before.
For Fishersgate, the weakest four-week period in the data is a recent one: Period 7 of 2026-27, when only 78.5% of stops arrived within three minutes of the timetable. The strongest was Period 4 of 2024-25, at 91.6%, which is 13.1 percentage points higher. Cancellations peaked at 5.4% of scheduled stops in Period 2 of 2026-27, against 2.4% over the latest 13 periods.
Compared with 3 stations of a similar size in South East, Fishersgate is the most punctual, at 84.7%. The comparison group includes Aldrington (83.7%), Barming (80.9%) and East Malling (82.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 17,939 | 84.7% | 2.4% |
Operators with their own page for this station are linked to it.
Late train at Fishersgate? Delay Repay
These operators call at Fishersgate and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,372 | 78.5% | 2.3% |
| Period 6 of 2026-27 | 1,396 | 82.1% | 2.7% |
| Period 5 of 2026-27 | 1,389 | 82.3% | 2.6% |
| Period 4 of 2026-27 | 1,386 | 85.7% | 2.0% |
| Period 3 of 2026-27 | 1,391 | 82.3% | 2.4% |
| Period 2 of 2026-27 | 1,343 | 84.6% | 5.4% |
| Period 1 of 2026-27 | 1,501 | 86.4% | 2.5% |
| Period 13 of 2025-26 | 1,469 | 88.3% | 3.3% |
| Period 12 of 2025-26 | 1,411 | 89.2% | 1.8% |
| Period 11 of 2025-26 | 1,388 | 88.4% | 1.6% |
| Period 10 of 2025-26 | 1,253 | 86.2% | 0.8% |
| Period 9 of 2025-26 | 1,301 | 83.0% | 1.5% |
| Period 8 of 2025-26 | 1,339 | 83.8% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Aldrington | 17,939 | 83.7% | 2.4% |
| Barming | 17,939 | 80.9% | 1.2% |
| East Malling | 17,939 | 82.4% | 1.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out