Fernhill
FERWalesManaged by TfW Rail
How this station is performing
Fernhill had 20,710 scheduled stops to Period 7 of 2026-27, about 57 a day. 92.6% of recorded arrivals were within three minutes of the timetable and 2.6% of scheduled stops were cancelled.
Fernhill opened on 3 October 1988, 38 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Fernhill is the newest; the oldest, Penrhiwceiber, opened in 1883.
The nearest stations to Fernhill are Mountain Ash (1.4 km east), Cwmbach (2.1 km north-west), Penrhiwceiber (3.1 km south-east), Merthyr Vale (4.1 km east) and Aberdare (4.3 km north-west). 20 stations lie within 10 km in all. Of the five, Merthyr Vale is the most punctual at 96.0% and Penrhiwceiber the least at 89.6%, with Fernhill on 92.6%.
Fernhill is one of 3 stations named after a Village called Fernhill; this one stands 1.1 km from its centre.
Across the whole run of data, the weakest four-week period for Fernhill was Period 9 of 2024-25, at 76.0%, some time before the latest year. The strongest was Period 13 of 2023-24, at 97.1%, and the two are 21.1 percentage points apart. Cancellations peaked at 21.3% of scheduled stops in Period 1 of 2023-24, against 2.6% over the latest 13 periods.
Compared with 3 stations of a similar size in Wales, Fernhill is the least punctual, at 92.6%. All of them are ahead, including Aberdare (95.9%), Mountain Ash (94.3%) and Cwmbach (95.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 20,710 | 92.6% | 2.6% |
Operators with their own page for this station are linked to it.
Late train at Fernhill? Delay Repay
These operators call at Fernhill and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,690 | 93.9% | 2.7% |
| Period 6 of 2026-27 | 1,710 | 92.7% | 3.2% |
| Period 5 of 2026-27 | 1,149 | 89.8% | 2.3% |
| Period 4 of 2026-27 | 1,720 | 86.7% | 2.3% |
| Period 3 of 2026-27 | 1,716 | 90.9% | 4.3% |
| Period 2 of 2026-27 | 1,711 | 93.5% | 4.0% |
| Period 1 of 2026-27 | 1,981 | 94.5% | 1.8% |
| Period 13 of 2025-26 | 1,873 | 96.3% | 1.1% |
| Period 12 of 2025-26 | 1,713 | 94.3% | 1.2% |
| Period 11 of 2025-26 | 495 | 92.0% | 1.4% |
| Period 10 of 2025-26 | 1,533 | 89.7% | 5.1% |
| Period 9 of 2025-26 | 1,711 | 91.4% | 2.2% |
| Period 8 of 2025-26 | 1,708 | 95.3% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Aberdare | 20,677 | 95.9% | 2.8% |
| Mountain Ash | 20,676 | 94.3% | 1.9% |
| Cwmbach | 20,675 | 95.1% | 3.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out