Fauldhouse
FLDScotlandManaged by ScotRail
How this station is performing
Fauldhouse had 12,554 scheduled stops to Period 7 of 2026-27, about 34 a day. 90.7% of recorded arrivals were within three minutes of the timetable and 1.4% of scheduled stops were cancelled.
Fauldhouse opened on 9 July 1869, 157 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Armadale (West Lothian) is the oldest (1862) and Blackridge the newest (2010), with Fauldhouse in between.
The nearest stations to Fauldhouse are Breich (3.3 km east), Shotts (5.0 km west), Blackridge (7.2 km north), Armadale (West Lothian) (7.3 km north) and Addiewell (7.4 km east). 7 stations lie within 10 km in all. Of the five, Breich is the most punctual at 90.9% and Addiewell the least at 88.4%, with Fauldhouse on 90.7%.
Fauldhouse takes its name from a Village called Fauldhouse, home to about 4,780 people, and the station stands 0.8 km from its centre.
Across the whole run of data, the weakest four-week period for Fauldhouse was Period 8 of 2024-25, at 76.6%, some time before the latest year. The strongest was Period 13 of 2023-24, at 96.3%, and the two are 19.7 percentage points apart. Cancellations peaked at 7.0% of scheduled stops in Period 10 of 2024-25, against 1.4% over the latest 13 periods.
Compared with 3 stations of a similar size in Scotland, Fauldhouse is the most punctual, at 90.7%. The comparison group includes Cleland (90.7%), Hartwood (88.6%) and Carfin (87.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 12,554 | 90.7% | 1.4% |
Operators with their own page for this station are linked to it.
Late train at Fauldhouse? Delay Repay
These operators call at Fauldhouse and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,008 | 88.4% | 1.7% |
| Period 6 of 2026-27 | 1,008 | 91.4% | 0.3% |
| Period 5 of 2026-27 | 1,008 | 90.6% | 0.4% |
| Period 4 of 2026-27 | 956 | 90.9% | 2.8% |
| Period 3 of 2026-27 | 1,008 | 92.9% | 1.5% |
| Period 2 of 2026-27 | 964 | 90.8% | 0.9% |
| Period 1 of 2026-27 | 1,128 | 93.1% | 2.3% |
| Period 13 of 2025-26 | 564 | 93.0% | 1.1% |
| Period 12 of 2025-26 | 1,008 | 92.8% | 1.5% |
| Period 11 of 2025-26 | 1,008 | 92.0% | 1.3% |
| Period 10 of 2025-26 | 877 | 90.2% | 2.1% |
| Period 9 of 2025-26 | 1,009 | 85.9% | 2.0% |
| Period 8 of 2025-26 | 1,008 | 87.2% | 0.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out