Farncombe
FNCSouth EastManaged by South Western Railway
How this station is performing
Farncombe had 24,828 scheduled stops to Period 7 of 2026-27, about 68 a day. 82.5% of recorded arrivals were within three minutes of the timetable and 3.9% of scheduled stops were cancelled.
Farncombe opened on 1 May 1897, 129 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Farncombe is the newest; the oldest, Guildford, opened in 1845.
The nearest stations to Farncombe are Godalming (1.6 km south-west), Shalford (Surrey) (3.2 km north-east), Milford (Surrey) (4.4 km south-west), Guildford (4.7 km north) and London Road (Guildford) (5.6 km north-east). 9 stations lie within 10 km in all. Of the five, London Road (Guildford) is the most punctual at 86.8% and Shalford (Surrey) the least at 78.7%, with Farncombe on 82.5%.
Farncombe takes its name from a Village called Farncombe, and the station stands 0.1 km from its centre.
Across the whole run of data, the weakest four-week period for Farncombe was Period 9 of 2024-25, at 65.9%, some time before the latest year. The strongest was Period 5 of 2023-24, at 93.3%, and the two are 27.4 percentage points apart. Cancellations peaked at 9.7% of scheduled stops in Period 2 of 2026-27, against 3.9% over the latest 13 periods.
2 of 3 stations of a similar size in South East are more punctual than Farncombe on 82.5%. The comparison group includes Cheddington (79.4%), Chertsey (84.6%) and Addlestone (86.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 24,828 | 82.5% | 3.9% |
Operators with their own page for this station are linked to it.
Late train at Farncombe? Delay Repay
These operators call at Farncombe and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,901 | 79.5% | 4.1% |
| Period 6 of 2026-27 | 1,988 | 83.9% | 2.5% |
| Period 5 of 2026-27 | 1,988 | 83.6% | 3.6% |
| Period 4 of 2026-27 | 1,981 | 83.7% | 3.4% |
| Period 3 of 2026-27 | 1,876 | 88.3% | 2.6% |
| Period 2 of 2026-27 | 1,985 | 77.5% | 9.7% |
| Period 1 of 2026-27 | 2,307 | 88.2% | 3.1% |
| Period 13 of 2025-26 | 2,205 | 88.5% | 2.0% |
| Period 12 of 2025-26 | 1,882 | 85.4% | 4.0% |
| Period 11 of 2025-26 | 1,919 | 81.9% | 3.3% |
| Period 10 of 2025-26 | 1,766 | 74.0% | 4.9% |
| Period 9 of 2025-26 | 1,858 | 74.2% | 3.2% |
| Period 8 of 2025-26 | 1,172 | 78.5% | 4.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Cheddington | 24,850 | 79.4% | 5.6% |
| Chertsey | 24,850 | 84.6% | 2.9% |
| Addlestone | 24,855 | 86.7% | 2.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out