Cheddington
CEDSouth EastManaged by West Midlands Trains (London Northwestern Railway)
How this station is performing
Cheddington had 24,850 scheduled stops to Period 7 of 2026-27, about 68 a day. 79.4% of recorded arrivals were within three minutes of the timetable and 5.6% of scheduled stops were cancelled.
Cheddington opened on 20 June 1839, 187 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Tring is the oldest (1837) and Wendover the newest (1892), with Cheddington in between.
The nearest stations to Cheddington are Leighton Buzzard (6.5 km north), Tring (7.0 km south-east), Stoke Mandeville (11.5 km south-west), Aylesbury (11.6 km south-west) and Wendover (12.2 km south-west). 2 stations lie within 10 km in all. Of the five, Aylesbury is the most punctual at 90.1% and Leighton Buzzard the least at 75.7%, with Cheddington on 79.4%.
Cheddington takes its name from a Village called Cheddington, home to about 1,896 people, and the station stands 1.3 km from its centre.
Cancellations are a particular problem at Cheddington. 5.6% of scheduled stops did not happen, 2.1 times the national median of 2.7%. Ranked from fewest cancellations to most, the station is 2202nd of 2,374.
Compared with 3 stations of a similar size in South East, Cheddington is the least punctual, at 79.4%. All of them are ahead, including Chertsey (84.6%), Addlestone (86.7%) and Farncombe (82.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 24,850 | 79.4% | 5.6% |
Operators with their own page for this station are linked to it.
Late train at Cheddington? Delay Repay
These operators call at Cheddington and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,927 | 80.6% | 4.7% |
| Period 6 of 2026-27 | 1,938 | 76.7% | 7.4% |
| Period 5 of 2026-27 | 1,936 | 78.2% | 8.1% |
| Period 4 of 2026-27 | 1,854 | 78.3% | 4.5% |
| Period 3 of 2026-27 | 1,902 | 81.7% | 4.2% |
| Period 2 of 2026-27 | 1,839 | 74.6% | 11.5% |
| Period 1 of 2026-27 | 1,806 | 79.7% | 5.5% |
| Period 13 of 2025-26 | 2,134 | 84.3% | 3.0% |
| Period 12 of 2025-26 | 1,937 | 81.3% | 3.7% |
| Period 11 of 2025-26 | 1,939 | 81.1% | 5.9% |
| Period 10 of 2025-26 | 1,774 | 81.3% | 5.7% |
| Period 9 of 2025-26 | 1,935 | 77.3% | 4.2% |
| Period 8 of 2025-26 | 1,929 | 75.6% | 4.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chertsey | 24,850 | 84.6% | 2.9% |
| Addlestone | 24,855 | 86.7% | 2.9% |
| Farncombe | 24,828 | 82.5% | 3.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out