Falls of Cruachan
FOCScotlandManaged by ScotRail
How this station is performing
Falls of Cruachan has usable figures for 2 of the last 13 four-week periods to Period 7 of 2026-27, covering 1,774 scheduled stops, about 5 a day. In those periods 70.2% of stops arrived within three minutes of the timetable and 1.1% of scheduled stops were cancelled.
Falls of Cruachan opened on 1 October 1893 and closed to passengers on 1 November 1965. It reopened on 20 June 1988, 38 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Falls of Cruachan is the newest; the oldest, Dalmally, opened in 1877.
The nearest stations to Falls of Cruachan are Loch Awe (4.5 km east), Dalmally (8.0 km east), Taynuilt (8.8 km north-west), Connel Ferry (17.9 km west) and Oban (22.4 km west). 3 stations lie within 10 km in all. At 70.2%, Falls of Cruachan is less punctual than all of them; the best of the five, Connel Ferry, manages 82.0%.
ScotRail is the only operator serving Falls of Cruachan. Here it manages 70.2% within three minutes, 17.7 percentage points worse than its 87.9% across its whole network.
Falls of Cruachan is a quiet station, ranked 2502nd for entries and exits in 2025-26, with about 2,288 of them. That is roughly 1 passengers for every scheduled stop.
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 1,774 | 70.2% | 1.1% |
Operators with their own page for this station are linked to it.
Late train at Falls of Cruachan? Delay Repay
These operators call at Falls of Cruachan and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 220 | – | 0.0% |
| Period 6 of 2026-27 | 220 | 69.1% | 0.5% |
| Period 5 of 2026-27 | 220 | 71.5% | 0.9% |
| Period 4 of 2026-27 | 220 | – | 2.3% |
| Period 3 of 2026-27 | 220 | – | 1.4% |
| Period 2 of 2026-27 | 220 | – | 0.5% |
| Period 1 of 2026-27 | 250 | – | 0.4% |
| Period 13 of 2025-26 | 83 | – | 4.8% |
| Period 12 of 2025-26 | 0 | – | – |
| Period 11 of 2025-26 | 0 | – | – |
| Period 10 of 2025-26 | 0 | – | – |
| Period 9 of 2025-26 | 0 | – | – |
| Period 8 of 2025-26 | 121 | – | 2.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out