Fairlie
FRLScotlandManaged by ScotRail
How this station is performing
Fairlie had 12,696 scheduled stops to Period 7 of 2026-27, about 35 a day. 86.9% of recorded arrivals were within three minutes of the timetable and 2.1% of scheduled stops were cancelled.
Fairlie opened on 1 June 1880, 146 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Dalry is the oldest (1840) and Ardrossan Harbour the newest (1987), with Fairlie in between.
The nearest stations to Fairlie are Largs (4.6 km north), West Kilbride (6.1 km south), Dalry (10.3 km south-east), Glengarnock (11.3 km east) and Ardrossan Harbour (12.7 km south). 2 stations lie within 10 km in all. Of the five, Dalry is the most punctual at 91.1% and West Kilbride the least at 80.9%, with Fairlie on 86.9%.
Fairlie takes its name from a Village called Fairlie, home to about 1,400 people, and the station stands 0.9 km from its centre.
For Fairlie, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 77.9% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 94.3%, which is 16.4 percentage points higher. Cancellations peaked at 6.6% of scheduled stops in Period 10 of 2023-24, against 2.1% over the latest 13 periods.
1 of 3 stations of a similar size in Scotland are more punctual than Fairlie on 86.9%. The comparison group includes Largs (83.5%), West Kilbride (80.9%) and Cleland (90.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 12,696 | 86.9% | 2.1% |
Operators with their own page for this station are linked to it.
Late train at Fairlie? Delay Repay
These operators call at Fairlie and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 996 | 85.9% | 1.6% |
| Period 6 of 2026-27 | 994 | 88.0% | 1.4% |
| Period 5 of 2026-27 | 996 | 87.3% | 1.0% |
| Period 4 of 2026-27 | 996 | 87.8% | 0.6% |
| Period 3 of 2026-27 | 996 | 88.8% | 1.3% |
| Period 2 of 2026-27 | 996 | 88.3% | 1.3% |
| Period 1 of 2026-27 | 1,135 | 92.3% | 3.3% |
| Period 13 of 2025-26 | 870 | 92.7% | 2.2% |
| Period 12 of 2025-26 | 996 | 88.2% | 2.1% |
| Period 11 of 2025-26 | 996 | 85.6% | 1.1% |
| Period 10 of 2025-26 | 879 | 80.1% | 2.7% |
| Period 9 of 2025-26 | 885 | 77.9% | 4.4% |
| Period 8 of 2025-26 | 961 | 84.2% | 4.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Largs | 12,696 | 83.5% | 2.1% |
| West Kilbride | 12,681 | 80.9% | 2.1% |
| Cleland | 12,554 | 90.7% | 1.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out