CrossCountry at Exeter St David's
All trains at Exeter St David'sCrossCountry across BritainSouth West
How this operator is doing here
CrossCountry had 12,621 scheduled stops at Exeter St David's in the 13 periods to Period 7 of 2026-27, 12% of the station's total. 66.9% of recorded arrivals came within three minutes and 7.3% of stops were cancelled.
CrossCountry trains at Exeter St David's also serve Dawlish Warren (16.1 km south-east, – on time, – cancelled), Dawlish (17.4 km south, 52.2% on time, 17.3% cancelled), Teignmouth (20.4 km south, 55.4% on time, 17.2% cancelled), Newton Abbot (22.5 km south, 66.8% on time, 8.9% cancelled), Tiverton Parkway (24.6 km north-east, 57.1% on time, 7.1% cancelled) and Torquay (29.8 km south, 70.0% on time, 21.8% cancelled), which are the stations on its network closest to Exeter St David's.
The busiest CrossCountry station within 30 km of Exeter St David's is Tiverton Parkway, 24.6 km north-east, with about 35 scheduled stops a day.
Of the 3 operators with enough records at Exeter St David's, CrossCountry is the least punctual, at 66.9%.
CrossCountry at Exeter St David's has slipped sharply. 66.9% of stops came within three minutes of the timetable in the latest 13 periods, 7.5 percentage points worse than the 74.4% recorded in the 13 before. Cancellations rose to 7.3% of scheduled stops from 5.2%, which is 2.1 percentage points more.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 936 | 68.4% | 8.8% |
| Period 6 of 2026-27 | 980 | 57.8% | 9.9% |
| Period 5 of 2026-27 | 977 | 55.4% | 7.9% |
| Period 4 of 2026-27 | 976 | 61.7% | 5.7% |
| Period 3 of 2026-27 | 950 | 65.4% | 3.8% |
| Period 2 of 2026-27 | 974 | 64.3% | 4.7% |
| Period 1 of 2026-27 | 1,096 | 74.0% | 2.7% |
| Period 13 of 2025-26 | 1,033 | 76.8% | 3.2% |
| Period 12 of 2025-26 | 942 | 81.2% | 5.0% |
| Period 11 of 2025-26 | 969 | 74.2% | 13.3% |
| Period 10 of 2025-26 | 881 | 64.8% | 15.8% |
| Period 9 of 2025-26 | 980 | 60.0% | 10.2% |
| Period 8 of 2025-26 | 927 | 63.4% | 5.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Exeter St David's
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 81,023 | 75.1% | 2.9% |
| South Western Railway | 10,816 | 70.1% | 4.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out