Great Western Railway at Exeter St David's
All trains at Exeter St David'sGreat Western Railway across BritainSouth West
How this operator is doing here
Great Western Railway had 81,023 scheduled stops at Exeter St David's in the 13 periods to Period 7 of 2026-27, 78% of the station's total. 75.1% of recorded arrivals came within three minutes and 2.9% of stops were cancelled.
Great Western Railway trains at Exeter St David's also serve Exeter Central (0.8 km east, 83.5% on time, 3.1% cancelled), Exeter St Thomas (1.4 km south, 79.3% on time, 2.4% cancelled), St James Park (Exeter) (1.4 km east, 82.7% on time, 3.1% cancelled), Polsloe Bridge (2.9 km east, 82.1% on time, 3.2% cancelled), Marsh Barton (3.2 km south-east, 79.7% on time, 2.3% cancelled) and Digby and Sowton (5.2 km east, 81.8% on time, 3.1% cancelled), which are the stations on its network closest to Exeter St David's.
Within 30 km of here, Great Western Railway runs best at Lympstone Village, 11.9 km south-east (85.2%), and worst at Yeoford, 13.9 km west (55.2%).
The busiest Great Western Railway station within 30 km of Exeter St David's is Newton Abbot, 22.5 km south, with about 127 scheduled stops a day.
Of the 3 operators with enough records at Exeter St David's, Great Western Railway is the most punctual, at 75.1%.
Great Western Railway at Exeter St David's has slipped a little, from 78.1% within three minutes in the previous 13 periods to 75.1% in the latest 13, a fall of 3.0 percentage points. Cancellations held steady at 2.9% of scheduled stops, against 2.7% before.
Period by period
See how Great Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 6,235 | 80.3% | 2.1% |
| Period 6 of 2026-27 | 6,356 | 70.3% | 2.5% |
| Period 5 of 2026-27 | 6,333 | 66.4% | 4.0% |
| Period 4 of 2026-27 | 6,333 | 68.5% | 4.4% |
| Period 3 of 2026-27 | 6,325 | 72.5% | 3.8% |
| Period 2 of 2026-27 | 6,337 | 73.4% | 2.9% |
| Period 1 of 2026-27 | 7,226 | 81.2% | 1.1% |
| Period 13 of 2025-26 | 6,435 | 84.3% | 1.8% |
| Period 12 of 2025-26 | 5,324 | 84.9% | 0.4% |
| Period 11 of 2025-26 | 5,989 | 80.6% | 6.9% |
| Period 10 of 2025-26 | 5,639 | 75.5% | 2.3% |
| Period 9 of 2025-26 | 6,191 | 68.1% | 3.2% |
| Period 8 of 2025-26 | 6,300 | 70.3% | 2.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Exeter St David's
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| CrossCountry | 12,621 | 66.9% | 7.3% |
| South Western Railway | 10,816 | 70.1% | 4.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out