CrossCountry at Ely
How this operator is doing here
CrossCountry had 11,055 scheduled stops at Ely in the 13 periods to Period 7 of 2026-27, 17% of the station's total. 61.4% of recorded arrivals came within three minutes and 3.5% of stops were cancelled.
CrossCountry trains at Ely also serve Manea (13.3 km north-west, 61.9% on time, 3.1% cancelled), Waterbeach (15.0 km south, – on time, – cancelled), Cambridge North (19.9 km south, – on time, – cancelled), March (22.2 km north-west, 65.0% on time, 3.4% cancelled), Cambridge (23.5 km south, 65.6% on time, 5.1% cancelled) and Whittlesea (31.4 km north-west, 66.6% on time, 3.8% cancelled), which are the stations on its network closest to Ely.
The busiest CrossCountry station within 30 km of Ely is Cambridge, 23.5 km south, with about 35 scheduled stops a day.
CrossCountry ranks 3rd of the 4 operators with enough records at Ely, on 61.4%.
For CrossCountry, Ely is the 54th best of 99 ranked stations. Its 61.4% here is 1.8 percentage points below the 63.2% across the whole network.
CrossCountry at Ely has slipped sharply. 61.4% of stops came within three minutes of the timetable in the latest 13 periods, 11.6 percentage points worse than the 73.0% recorded in the 13 before. Cancellations fell to 3.5% of scheduled stops from 4.5%, which is 1.0 percentage points fewer.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 808 | 49.3% | 2.8% |
| Period 6 of 2026-27 | 890 | 44.4% | 2.6% |
| Period 5 of 2026-27 | 885 | 47.6% | 4.0% |
| Period 4 of 2026-27 | 868 | 51.0% | 3.8% |
| Period 3 of 2026-27 | 864 | 63.0% | 3.2% |
| Period 2 of 2026-27 | 730 | 62.2% | 2.9% |
| Period 1 of 2026-27 | 929 | 73.2% | 1.5% |
| Period 13 of 2025-26 | 976 | 71.5% | 3.4% |
| Period 12 of 2025-26 | 890 | 74.7% | 3.5% |
| Period 11 of 2025-26 | 861 | 72.9% | 3.0% |
| Period 10 of 2025-26 | 775 | 66.1% | 9.0% |
| Period 9 of 2025-26 | 867 | 59.1% | 4.7% |
| Period 8 of 2025-26 | 712 | 62.1% | 1.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Ely
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 23,301 | 66.9% | 10.7% |
| Greater Anglia | 20,662 | 79.1% | 1.9% |
| East Midlands Railway | 9,239 | 56.4% | 5.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out