Greater Anglia at Ely
All trains at ElyGreater Anglia across BritainEast of England
How this operator is doing here
Greater Anglia had 20,662 scheduled stops at Ely in the 13 periods to Period 7 of 2026-27, 32% of the station's total. 79.1% of recorded arrivals came within three minutes and 1.9% of stops were cancelled.
Greater Anglia trains at Ely also serve Soham (7.5 km south-east, 66.8% on time, 0.8% cancelled), Shippea Hill (10.8 km north-east, – on time, – cancelled), Manea (13.3 km north-west, 67.3% on time, 2.0% cancelled), Waterbeach (15.0 km south, 76.9% on time, 4.4% cancelled), Lakenheath (19.2 km east, – on time, – cancelled) and Newmarket (19.5 km south-east, 89.9% on time, 1.9% cancelled), which are the stations on its network closest to Ely.
Within 30 km of here, Greater Anglia runs best at Newmarket, 19.5 km south-east (89.9%), and worst at Soham, 7.5 km south-east (66.8%).
The busiest Greater Anglia station within 30 km of Ely is Cambridge, 23.5 km south, with about 152 scheduled stops a day.
Greater Anglia at Ely has slipped sharply. 79.1% of stops came within three minutes of the timetable in the latest 13 periods, 6.8 percentage points worse than the 85.9% recorded in the 13 before. Cancellations rose to 1.9% of scheduled stops from 1.2%, which is 0.7 percentage points more.
Period by period
See how Greater Anglia Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,536 | 70.1% | 1.8% |
| Period 6 of 2026-27 | 1,716 | 64.9% | 2.5% |
| Period 5 of 2026-27 | 1,690 | 75.0% | 2.7% |
| Period 4 of 2026-27 | 1,645 | 78.0% | 3.5% |
| Period 3 of 2026-27 | 1,615 | 80.7% | 1.9% |
| Period 2 of 2026-27 | 1,349 | 81.1% | 0.6% |
| Period 1 of 2026-27 | 1,714 | 87.2% | 1.7% |
| Period 13 of 2025-26 | 1,771 | 83.8% | 2.9% |
| Period 12 of 2025-26 | 1,644 | 86.0% | 2.4% |
| Period 11 of 2025-26 | 1,624 | 85.3% | 0.5% |
| Period 10 of 2025-26 | 1,390 | 81.6% | 0.8% |
| Period 9 of 2025-26 | 1,570 | 78.0% | 1.4% |
| Period 8 of 2025-26 | 1,398 | 76.1% | 0.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Ely
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 23,301 | 66.9% | 10.7% |
| CrossCountry | 11,055 | 61.4% | 3.5% |
| East Midlands Railway | 9,239 | 56.4% | 5.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out