Elmstead Woods
ESDLondonManaged by Southeastern
How this station is performing
Elmstead Woods had 48,715 scheduled stops to Period 7 of 2026-27, about 134 a day. 90.8% of recorded arrivals were within three minutes of the timetable and 1.2% of scheduled stops were cancelled.
Elmstead Woods opened on 1 July 1904, 122 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Elmstead Woods is the newest; the oldest, Bickley, opened in 1858.
The nearest stations to Elmstead Woods are Chislehurst (1.5 km south-east), Sundridge Park (1.6 km west), Bickley (1.8 km south), Bromley North (2.1 km south-west) and Grove Park (2.2 km north-west). 75 stations lie within 10 km in all. Of the five, Sundridge Park is the most punctual at 99.4% and Bickley the least at 85.8%, with Elmstead Woods on 90.8%.
Elmstead Woods is named after Elmstead, an area of London, but the station stands 0.4 km from its centre.
Across the whole run of data, the weakest four-week period for Elmstead Woods was Period 9 of 2024-25, at 82.2%, some time before the latest year. The strongest was Period 3 of 2025-26, at 94.1%, and the two are 11.9 percentage points apart.
2 of 3 stations of a similar size in London are more punctual than Elmstead Woods on 90.8%. The comparison group includes Chislehurst (91.0%), Cheam (92.1%) and Norbiton (85.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 48,715 | 90.8% | 1.2% |
Operators with their own page for this station are linked to it.
Late train at Elmstead Woods? Delay Repay
These operators call at Elmstead Woods and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,496 | 89.0% | 0.7% |
| Period 6 of 2026-27 | 3,839 | 88.1% | 0.9% |
| Period 5 of 2026-27 | 3,596 | 92.8% | 1.9% |
| Period 4 of 2026-27 | 3,850 | 91.2% | 1.2% |
| Period 3 of 2026-27 | 3,848 | 90.0% | 2.7% |
| Period 2 of 2026-27 | 3,487 | 92.2% | 1.2% |
| Period 1 of 2026-27 | 4,286 | 94.0% | 0.8% |
| Period 13 of 2025-26 | 4,221 | 91.9% | 1.0% |
| Period 12 of 2025-26 | 3,778 | 90.9% | 0.6% |
| Period 11 of 2025-26 | 3,776 | 91.6% | 0.7% |
| Period 10 of 2025-26 | 2,976 | 90.8% | 1.3% |
| Period 9 of 2025-26 | 3,852 | 87.9% | 1.5% |
| Period 8 of 2025-26 | 3,710 | 89.4% | 0.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chislehurst | 48,717 | 91.0% | 1.2% |
| Cheam | 48,544 | 92.1% | 2.6% |
| Norbiton | 48,110 | 85.1% | 5.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out