Merseyrail at Ellesmere Port
All trains at Ellesmere PortMerseyrail across BritainNorth West
How this operator is doing here
Merseyrail had 26,039 scheduled stops at Ellesmere Port in the 13 periods to Period 7 of 2026-27, 95% of the station's total. 93.9% of recorded arrivals came within three minutes and 1.7% of stops were cancelled.
Merseyrail trains at Ellesmere Port also serve Overpool (2.0 km west, 97.9% on time, 1.8% cancelled), Little Sutton (3.2 km west, 83.2% on time, 1.8% cancelled), Capenhurst (4.0 km south-west, 87.2% on time, 2.6% cancelled), Hooton (5.6 km west, 87.8% on time, 2.2% cancelled), Eastham Rake (6.4 km north-west, 88.2% on time, 3.6% cancelled) and Bromborough (7.5 km north-west, 88.3% on time, 3.6% cancelled), which are the stations on its network closest to Ellesmere Port.
Within 30 km of here, Merseyrail runs best at Wallasey Grove Road, 19.9 km north-west (99.3%), and worst at Leasowe, 19.5 km north-west (72.4%).
The busiest Merseyrail station within 30 km of Ellesmere Port is Liverpool Central, 14.7 km north, with about 582 scheduled stops a day.
Of the 2 operators with enough records at Ellesmere Port, Merseyrail is the most punctual, at 93.9%.
For Merseyrail, Ellesmere Port is the 16th best of 62 ranked stations. Its 93.9% here is 2.4 percentage points above the 91.5% across the whole network.
Period by period
See how Merseyrail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,960 | 96.2% | 1.4% |
| Period 6 of 2026-27 | 1,980 | 94.0% | 3.0% |
| Period 5 of 2026-27 | 1,980 | 95.0% | 1.6% |
| Period 4 of 2026-27 | 1,978 | 90.4% | 1.0% |
| Period 3 of 2026-27 | 1,980 | 92.3% | 1.6% |
| Period 2 of 2026-27 | 1,980 | 93.5% | 0.6% |
| Period 1 of 2026-27 | 2,265 | 95.1% | 0.5% |
| Period 13 of 2025-26 | 2,186 | 93.6% | 1.1% |
| Period 12 of 2025-26 | 1,980 | 91.8% | 1.5% |
| Period 11 of 2025-26 | 1,980 | 93.0% | 4.5% |
| Period 10 of 2025-26 | 1,787 | 94.6% | 1.4% |
| Period 9 of 2025-26 | 1,959 | 94.2% | 1.6% |
| Period 8 of 2025-26 | 2,024 | 96.3% | 2.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Ellesmere Port
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 1,260 | 93.6% | 11.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out