Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Northern at Ellesmere Port

All trains at Ellesmere PortNorthern across BritainNorth West

On time, last 13 periods93.6%Whole station: 93.8%
Cancelled11.0%Whole station: 2.1%
Scheduled stops1,260Of 27,299 at the station

How this operator is doing here

Northern had 1,260 scheduled stops at Ellesmere Port in the 13 periods to Period 7 of 2026-27, 5% of the station's total. 93.6% of recorded arrivals came within three minutes and 11.0% of stops were cancelled.

Northern trains at Ellesmere Port also serve Ince and Elton (Cheshire) (5.3 km east, 93.6% on time, 11.0% cancelled), Helsby (8.3 km east, 75.1% on time, 7.6% cancelled), Liverpool South Parkway (8.4 km north, 70.7% on time, 3.4% cancelled), Hunts Cross (9.1 km north, 75.7% on time, 3.3% cancelled), Chester (9.5 km south, 75.4% on time, 3.7% cancelled) and West Allerton (9.7 km north, 75.3% on time, 3.6% cancelled), which are the stations on its network closest to Ellesmere Port.

Within 30 km of here, Northern runs best at Thatto Heath, 19.4 km north-east (90.7%), and worst at Warrington West, 21.2 km north-east (66.5%).

The busiest Northern station within 30 km of Ellesmere Port is Liverpool Lime Street, 15.0 km north, with about 193 scheduled stops a day.

Of the 2 operators with enough records at Ellesmere Port, Northern is the least punctual, at 93.6%.

Northern at Ellesmere Port has slipped a little, from 96.1% within three minutes in the previous 13 periods to 93.6% in the latest 13, a fall of 2.5 percentage points. Cancellations fell to 11.0% of scheduled stops from 16.3%, which is 5.3 percentage points fewer.

Period by period

70%80%90%100%2023-242024-252025-262026-27Period 1 of 2023-24: 72.9%Period 11 of 2023-24: 89.2%Period 12 of 2023-24: 95.5%Period 13 of 2023-24: 93.4%Period 5 of 2024-25: 92.3%Period 6 of 2024-25: 98.1%Period 7 of 2024-25: 87.5%Period 9 of 2024-25: 96.9%Period 11 of 2024-25: 95.8%Period 12 of 2024-25: 97.6%Period 13 of 2024-25: 96.5%Period 1 of 2025-26: 97.4%Period 2 of 2025-26: 98.9%Period 3 of 2025-26: 90.1%Period 4 of 2025-26: 94.0%Period 5 of 2025-26: 97.4%Period 6 of 2025-26: 98.7%Period 7 of 2025-26: 93.6%Period 8 of 2025-26: 98.6%Period 9 of 2025-26: 95.5%Period 10 of 2025-26: 91.7%Period 11 of 2025-26: 92.0%Period 12 of 2025-26: 92.4%Period 13 of 2025-26: 94.2%Period 1 of 2026-27: 94.3%Period 2 of 2026-27: 94.8%Period 3 of 2026-27: 89.8%Period 4 of 2026-27: 93.5%Period 5 of 2026-27: 97.8%Period 6 of 2026-27: 92.0%Period 7 of 2026-27: 90.0%
This pageGreat Britain
0%10%20%30%40%50%Period 1 of 2023-24: 36.8%Period 11 of 2023-24: 0.0%Period 12 of 2023-24: 17.5%Period 13 of 2023-24: 19.1%Period 5 of 2024-25: 50.0%Period 6 of 2024-25: 45.8%Period 7 of 2024-25: 45.5%Period 9 of 2024-25: 23.8%Period 11 of 2024-25: 22.8%Period 12 of 2024-25: 12.5%Period 13 of 2024-25: 15.0%Period 1 of 2025-26: 15.2%Period 2 of 2025-26: 6.3%Period 3 of 2025-26: 15.6%Period 4 of 2025-26: 12.5%Period 5 of 2025-26: 18.8%Period 6 of 2025-26: 18.8%Period 7 of 2025-26: 18.8%Period 8 of 2025-26: 25.0%Period 9 of 2025-26: 31.3%Period 10 of 2025-26: 45.5%Period 11 of 2025-26: 8.3%Period 12 of 2025-26: 4.2%Period 13 of 2025-26: 0.0%Period 1 of 2026-27: 5.4%Period 2 of 2026-27: 0.0%Period 3 of 2026-27: 4.3%Period 4 of 2026-27: 4.2%Period 5 of 2026-27: 4.2%Period 6 of 2026-27: 8.3%Period 7 of 2026-27: 6.3%2023-242024-252025-262026-27

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-279690.0%6.3%
Period 6 of 2026-279692.0%8.3%
Period 5 of 2026-279697.8%4.2%
Period 4 of 2026-279693.5%4.2%
Period 3 of 2026-279289.8%4.3%
Period 2 of 2026-279694.8%0.0%
Period 1 of 2026-2711294.3%5.4%
Period 13 of 2025-2610494.2%0.0%
Period 12 of 2025-269692.4%4.2%
Period 11 of 2025-269692.0%8.3%
Period 10 of 2025-268891.7%45.5%
Period 9 of 2025-269695.5%31.3%
Period 8 of 2025-269698.6%25.0%

Time of year

80%90%100%P1: 90.9%1P2: 96.8%2P3: 89.9%3P4: 93.7%4P5: 96.6%5P6: 95.9%6P7: 90.7%78P9: 96.2%910P11: 92.3%11P12: 95.1%12P13: 94.7%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Ellesmere Port

OperatorScheduled stopsWithin 3 minCancelled
Merseyrail26,03993.9%1.7%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out