Eastbrook
EBKWalesManaged by TfW Rail
How this station is performing
Eastbrook had 43,451 scheduled stops to Period 7 of 2026-27, about 119 a day. 88.8% of recorded arrivals were within three minutes of the timetable and 3.3% of scheduled stops were cancelled.
Eastbrook opened on 24 November 1986, 40 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Eastbrook is the newest; the oldest, Penarth, opened in 1878.
The nearest stations to Eastbrook are Dinas Powys (1.1 km south-west), Cogan (1.5 km north-east), Dingle Road (1.9 km east), Penarth (2.2 km east) and Grangetown (Cardiff) (3.5 km north). 26 stations lie within 10 km in all. At 88.8%, Eastbrook is less punctual than all of them; the best of the five, Penarth, manages 96.1%.
Eastbrook takes its name from a suburb called Eastbrook, and the station stands 0.5 km from its centre.
Eastbrook improved sharply over the past year. In the latest 13 periods 88.8% of stops came within three minutes of the timetable, up 5.0 percentage points from 83.8% in the 13 before. Cancellations held steady at 3.3% of scheduled stops, against 3.1% before.
Compared with 3 stations of a similar size in Wales, Eastbrook is the least punctual, at 88.8%. All of them are ahead, including Barry Docks (89.8%), Cadoxton (90.3%) and Cogan (89.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 43,451 | 88.8% | 3.3% |
Operators with their own page for this station are linked to it.
Late train at Eastbrook? Delay Repay
These operators call at Eastbrook and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,201 | 89.6% | 2.9% |
| Period 6 of 2026-27 | 3,290 | 87.8% | 1.5% |
| Period 5 of 2026-27 | 3,374 | 86.6% | 4.9% |
| Period 4 of 2026-27 | 3,283 | 85.6% | 4.2% |
| Period 3 of 2026-27 | 3,295 | 89.6% | 2.5% |
| Period 2 of 2026-27 | 3,352 | 91.0% | 4.7% |
| Period 1 of 2026-27 | 3,836 | 92.0% | 2.9% |
| Period 13 of 2025-26 | 3,642 | 92.5% | 4.0% |
| Period 12 of 2025-26 | 3,330 | 92.1% | 1.7% |
| Period 11 of 2025-26 | 3,239 | 92.2% | 3.4% |
| Period 10 of 2025-26 | 2,966 | 85.9% | 3.7% |
| Period 9 of 2025-26 | 3,326 | 82.8% | 4.3% |
| Period 8 of 2025-26 | 3,317 | 85.9% | 2.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Barry Docks | 43,451 | 89.8% | 3.2% |
| Cadoxton | 43,451 | 90.3% | 3.2% |
| Cogan | 43,451 | 89.8% | 3.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out