Barry Docks
BYDWalesManaged by TfW Rail
How this station is performing
Barry Docks had 43,451 scheduled stops to Period 7 of 2026-27, about 119 a day. 89.8% of recorded arrivals were within three minutes of the timetable and 3.2% of scheduled stops were cancelled.
Barry Docks opened on 20 December 1888, 138 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Barry Docks is the oldest; the next oldest, Cadoxton, dates from 1888.
The nearest stations to Barry Docks are Cadoxton (1.4 km north-east), Barry Island (1.5 km south-west), Barry (1.8 km west), Dinas Powys (4.3 km north-east) and Eastbrook (5.5 km north-east). 14 stations lie within 10 km in all. Of the five, Barry Island is the most punctual at 96.4% and Eastbrook the least at 88.8%, with Barry Docks on 89.8%.
Barry Docks takes its name from a settlement called Barry Docks, and the station stands 0.7 km from its centre.
Barry Docks has edged up: 89.8% of stops came within three minutes of the timetable in the latest 13 periods, 4.5 percentage points better than the 85.3% of the 13 before. Cancellations held steady at 3.2% of scheduled stops, against 3.0% before.
1 of 3 stations of a similar size in Wales are more punctual than Barry Docks on 89.8%. The comparison group includes Cadoxton (90.3%), Cogan (89.8%) and Dinas Powys (89.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 43,451 | 89.8% | 3.2% |
Operators with their own page for this station are linked to it.
Late train at Barry Docks? Delay Repay
These operators call at Barry Docks and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,201 | 90.1% | 2.7% |
| Period 6 of 2026-27 | 3,290 | 89.3% | 1.3% |
| Period 5 of 2026-27 | 3,374 | 87.7% | 4.4% |
| Period 4 of 2026-27 | 3,283 | 87.3% | 3.9% |
| Period 3 of 2026-27 | 3,295 | 89.2% | 2.5% |
| Period 2 of 2026-27 | 3,352 | 91.9% | 4.4% |
| Period 1 of 2026-27 | 3,836 | 93.2% | 2.6% |
| Period 13 of 2025-26 | 3,642 | 93.2% | 3.9% |
| Period 12 of 2025-26 | 3,330 | 93.3% | 1.6% |
| Period 11 of 2025-26 | 3,239 | 92.7% | 3.3% |
| Period 10 of 2025-26 | 2,966 | 86.5% | 3.6% |
| Period 9 of 2025-26 | 3,326 | 84.1% | 4.2% |
| Period 8 of 2025-26 | 3,317 | 87.1% | 2.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Cadoxton | 43,451 | 90.3% | 3.2% |
| Cogan | 43,451 | 89.8% | 3.2% |
| Dinas Powys | 43,451 | 89.4% | 3.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out