Cadoxton
CADWalesManaged by TfW Rail
How this station is performing
Cadoxton had 43,451 scheduled stops to Period 7 of 2026-27, about 119 a day. 90.3% of recorded arrivals were within three minutes of the timetable and 3.2% of scheduled stops were cancelled.
Cadoxton opened on 20 December 1888, 138 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Cadoxton is the oldest; the next oldest, Barry Docks, dates from 1888.
The nearest stations to Cadoxton are Barry Docks (1.4 km south-west), Barry Island (2.8 km south-west), Dinas Powys (3.0 km north-east), Barry (3.0 km south-west) and Eastbrook (4.1 km north-east). 18 stations lie within 10 km in all. Of the five, Barry Island is the most punctual at 96.4% and Eastbrook the least at 88.8%, with Cadoxton on 90.3%.
Cadoxton is one of 2 stations named after a neighborhood called Cadoxton; this one stands 0.6 km from its centre.
Cadoxton has edged up: 90.3% of stops came within three minutes of the timetable in the latest 13 periods, 4.6 percentage points better than the 85.7% of the 13 before. Cancellations held steady at 3.2% of scheduled stops, against 3.0% before.
Compared with 3 stations of a similar size in Wales, Cadoxton is the most punctual, at 90.3%. The comparison group includes Barry Docks (89.8%), Cogan (89.8%) and Dinas Powys (89.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 43,451 | 90.3% | 3.2% |
Operators with their own page for this station are linked to it.
Late train at Cadoxton? Delay Repay
These operators call at Cadoxton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,201 | 90.8% | 2.7% |
| Period 6 of 2026-27 | 3,290 | 89.7% | 1.3% |
| Period 5 of 2026-27 | 3,374 | 88.1% | 4.6% |
| Period 4 of 2026-27 | 3,283 | 88.0% | 4.1% |
| Period 3 of 2026-27 | 3,295 | 89.6% | 2.5% |
| Period 2 of 2026-27 | 3,352 | 92.5% | 4.5% |
| Period 1 of 2026-27 | 3,836 | 93.4% | 2.7% |
| Period 13 of 2025-26 | 3,642 | 93.9% | 4.0% |
| Period 12 of 2025-26 | 3,330 | 93.7% | 1.6% |
| Period 11 of 2025-26 | 3,239 | 93.2% | 3.3% |
| Period 10 of 2025-26 | 2,966 | 87.4% | 3.6% |
| Period 9 of 2025-26 | 3,326 | 84.7% | 4.3% |
| Period 8 of 2025-26 | 3,317 | 87.4% | 2.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Barry Docks | 43,451 | 89.8% | 3.2% |
| Cogan | 43,451 | 89.8% | 3.2% |
| Dinas Powys | 43,451 | 89.4% | 3.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out