ScotRail at East Linton
How this operator is doing here
ScotRail had 3,534 scheduled stops at East Linton in the 13 periods to Period 7 of 2026-27, 40% of the station's total. 80.9% of recorded arrivals came within three minutes and 0.6% of stops were cancelled.
ScotRail trains at East Linton also serve Drem (7.9 km west, 84.5% on time, 0.8% cancelled), North Berwick (8.8 km north-west, 91.6% on time, 0.9% cancelled), Dunbar (9.4 km east, 83.6% on time, 0.6% cancelled), Longniddry (14.1 km west, 86.6% on time, 0.8% cancelled), Prestonpans (19.8 km west, 87.1% on time, 0.7% cancelled) and Wallyford (22.5 km west, 86.9% on time, 0.7% cancelled), which are the stations on its network closest to East Linton.
Within 30 km of here, ScotRail runs best at North Berwick, 8.8 km north-west (91.6%), and worst at Dunbar, 9.4 km east (83.6%).
The busiest ScotRail station within 30 km of East Linton is Newcraighall, 27.3 km west, with about 58 scheduled stops a day.
ScotRail at East Linton has slipped sharply. 80.9% of stops came within three minutes of the timetable in the latest 13 periods, 5.3 percentage points worse than the 86.2% recorded in the 13 before. Cancellations fell to 0.6% of scheduled stops from 1.1%, which is 0.5 percentage points fewer.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 267 | 76.5% | 1.1% |
| Period 6 of 2026-27 | 267 | 80.1% | 0.4% |
| Period 5 of 2026-27 | 276 | 71.1% | 1.1% |
| Period 4 of 2026-27 | 276 | 79.2% | 0.7% |
| Period 3 of 2026-27 | 276 | 84.9% | 1.8% |
| Period 2 of 2026-27 | 276 | 78.6% | 0.0% |
| Period 1 of 2026-27 | 321 | 81.4% | 0.9% |
| Period 13 of 2025-26 | 300 | 83.6% | 0.7% |
| Period 12 of 2025-26 | 276 | 82.2% | 0.0% |
| Period 11 of 2025-26 | 276 | 82.6% | 0.0% |
| Period 10 of 2025-26 | 211 | 79.4% | 0.9% |
| Period 9 of 2025-26 | 256 | 85.4% | 0.8% |
| Period 8 of 2025-26 | 256 | 85.9% | 0.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at East Linton
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 5,237 | 74.9% | 1.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out