East Kilbride
EKLScotlandManaged by ScotRail
How this station is performing
East Kilbride had 25,705 scheduled stops to Period 7 of 2026-27, about 71 a day. 96.1% of recorded arrivals were within three minutes of the timetable and 1.5% of scheduled stops were cancelled.
East Kilbride opened on 1 September 1868, 158 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Busby is the oldest (1866) and Burnside (South Lanarkshire) the newest (1904), with East Kilbride in between.
The nearest stations to East Kilbride are Hairmyres (3.2 km west), Thorntonhall (4.4 km west), Kirkhill (5.4 km north), Busby (5.4 km west) and Burnside (South Lanarkshire) (5.8 km north). 37 stations lie within 10 km in all. At 96.1%, East Kilbride is more punctual than every one of them; the best of the five, Busby, manages 95.9%.
East Kilbride takes its name from a town called East Kilbride, home to about 75,120 people, and the station stands 0.2 km from its centre.
East Kilbride is among the most punctual stations in Britain. Its 96.1% puts it 70th out of 2,374 ranked stations, with 69 ahead of it and 2,304 behind, and 12.2 percentage points above the national median of 83.9%.
1 of 3 stations of a similar size in Scotland are more punctual than East Kilbride on 96.1%. The comparison group includes Busby (95.9%), Clarkston (97.1%) and Ladybank (81.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 25,705 | 96.1% | 1.5% |
Operators with their own page for this station are linked to it.
Late train at East Kilbride? Delay Repay
These operators call at East Kilbride and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,044 | 96.8% | 0.9% |
| Period 6 of 2026-27 | 2,044 | 97.6% | 0.7% |
| Period 5 of 2026-27 | 2,044 | 97.2% | 0.3% |
| Period 4 of 2026-27 | 2,043 | 97.4% | 1.5% |
| Period 3 of 2026-27 | 2,047 | 95.9% | 4.0% |
| Period 2 of 2026-27 | 1,905 | 95.8% | 1.6% |
| Period 1 of 2026-27 | 2,340 | 97.5% | 1.0% |
| Period 13 of 2025-26 | 1,545 | 96.8% | 2.3% |
| Period 12 of 2025-26 | 2,044 | 97.0% | 0.5% |
| Period 11 of 2025-26 | 2,044 | 97.1% | 0.4% |
| Period 10 of 2025-26 | 1,806 | 94.7% | 1.4% |
| Period 9 of 2025-26 | 1,903 | 90.1% | 3.6% |
| Period 8 of 2025-26 | 1,896 | 94.5% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out