GTR at Earlswood (Surrey)
All trains at Earlswood (Surrey)GTR across BritainSouth East
How this operator is doing here
GTR had 27,727 scheduled stops at Earlswood (Surrey) in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 76.2% of recorded arrivals came within three minutes and 8.5% of stops were cancelled.
GTR trains at Earlswood (Surrey) also serve Redhill (1.4 km north, 78.6% on time, 5.4% cancelled), Nutfield (2.7 km east, 82.5% on time, 1.5% cancelled), Reigate (2.7 km north-west, 86.5% on time, 5.2% cancelled), Salfords (Surrey) (3.0 km south, 77.4% on time, 8.5% cancelled), Merstham (4.3 km north, 80.8% on time, 5.1% cancelled) and Horley (6.6 km south, 76.4% on time, 7.1% cancelled), which are the stations on its network closest to Earlswood (Surrey).
Within 30 km of here, GTR runs best at Birkbeck, 21.2 km north (98.1%), and worst at Kenley, 11.8 km north-east (66.9%).
The busiest GTR station within 30 km of Earlswood (Surrey) is East Croydon, 17.3 km north, with about 813 scheduled stops a day.
Of the 1 operators with enough records at Earlswood (Surrey), GTR is the most punctual, at 76.2%.
For GTR, Earlswood (Surrey) is the 248th best of 307 ranked stations. Its 76.2% here is 6.7 percentage points below the 82.9% across the whole network.
GTR at Earlswood (Surrey) has slipped a little, from 78.0% within three minutes in the previous 13 periods to 76.2% in the latest 13, a fall of 1.8 percentage points. Cancellations fell to 8.5% of scheduled stops from 9.9%, which is 1.4 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,212 | 75.4% | 6.6% |
| Period 6 of 2026-27 | 2,126 | 69.3% | 10.7% |
| Period 5 of 2026-27 | 2,010 | 65.7% | 11.8% |
| Period 4 of 2026-27 | 2,152 | 72.3% | 13.1% |
| Period 3 of 2026-27 | 1,898 | 75.0% | 5.1% |
| Period 2 of 2026-27 | 2,175 | 82.4% | 5.1% |
| Period 1 of 2026-27 | 2,468 | 82.7% | 4.9% |
| Period 13 of 2025-26 | 2,416 | 83.3% | 4.2% |
| Period 12 of 2025-26 | 2,215 | 78.7% | 12.1% |
| Period 11 of 2025-26 | 1,888 | 73.3% | 7.8% |
| Period 10 of 2025-26 | 1,819 | 80.1% | 10.1% |
| Period 9 of 2025-26 | 2,204 | 71.1% | 14.3% |
| Period 8 of 2025-26 | 2,144 | 76.7% | 5.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out