ScotRail at Dumbarton Central
All trains at Dumbarton CentralScotRail across BritainScotland
How this operator is doing here
ScotRail had 54,021 scheduled stops at Dumbarton Central in the 13 periods to Period 7 of 2026-27, 99% of the station's total. 82.3% of recorded arrivals came within three minutes and 2.5% of stops were cancelled.
ScotRail trains at Dumbarton Central also serve Dalreoch (0.6 km west, 86.3% on time, 3.5% cancelled), Dumbarton East (0.9 km south-east, 83.8% on time, 1.9% cancelled), Langbank (2.7 km south-west, 96.1% on time, 1.2% cancelled), Renton (2.9 km north-west, 84.2% on time, 4.4% cancelled), Alexandria (4.3 km north, – on time, 4.4% cancelled) and Bowling (4.9 km east, 82.3% on time, 1.9% cancelled), which are the stations on its network closest to Dumbarton Central.
Within 30 km of here, ScotRail runs best at Neilston, 20.2 km south-east (97.6%), and worst at Helensburgh Upper, 12.5 km north-west (58.2%).
The busiest ScotRail station within 30 km of Dumbarton Central is Glasgow Central, 21.6 km south-east, with about 995 scheduled stops a day.
Of the 1 operators with enough records at Dumbarton Central, ScotRail is the most punctual, at 82.3%.
For ScotRail, Dumbarton Central is the 253rd best of 312 ranked stations. Its 82.3% here is 5.6 percentage points below the 87.9% across the whole network.
Cancellations of ScotRail at Dumbarton Central are near its usual level: 2.5% of scheduled stops, against 1.6% across its network and 2.5% for every operator at the station.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,173 | 80.3% | 2.9% |
| Period 6 of 2026-27 | 4,176 | 84.6% | 1.8% |
| Period 5 of 2026-27 | 4,176 | 84.3% | 2.5% |
| Period 4 of 2026-27 | 4,174 | 84.5% | 3.1% |
| Period 3 of 2026-27 | 4,176 | 86.1% | 1.3% |
| Period 2 of 2026-27 | 4,176 | 83.1% | 1.6% |
| Period 1 of 2026-27 | 4,780 | 85.7% | 1.5% |
| Period 13 of 2025-26 | 4,610 | 84.3% | 1.7% |
| Period 12 of 2025-26 | 4,168 | 83.2% | 2.2% |
| Period 11 of 2025-26 | 4,165 | 83.1% | 2.1% |
| Period 10 of 2025-26 | 2,923 | 77.7% | 3.7% |
| Period 9 of 2025-26 | 4,158 | 75.3% | 4.8% |
| Period 8 of 2025-26 | 4,166 | 74.7% | 4.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Dumbarton Central
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Caledonian Sleeper | 281 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out