Drumgelloch
DRUScotlandManaged by ScotRail
How this station is performing
Drumgelloch had 31,587 scheduled stops to Period 7 of 2026-27, about 87 a day. 89.2% of recorded arrivals were within three minutes of the timetable and 1.7% of scheduled stops were cancelled.
Drumgelloch opened on 15 May 1989. It was moved to the site it uses now on 6 March 2011. Among the 5 stations nearest to it with a known opening date, Airdrie is the oldest (1862) and Whifflet the newest (1992), with Drumgelloch in between.
The nearest stations to Drumgelloch are Airdrie (2.2 km west), Coatdyke (3.6 km west), Caldercruix (4.4 km north-east), Whifflet (4.6 km west) and Coatbridge Sunnyside (5.0 km west). 21 stations lie within 10 km in all. Of the five, Caldercruix is the most punctual at 89.9% and Whifflet the least at 79.4%, with Drumgelloch on 89.2%.
Across the whole run of data, the weakest four-week period for Drumgelloch was Period 8 of 2024-25, at 77.7%, some time before the latest year. The strongest was Period 4 of 2023-24, at 94.4%, and the two are 16.7 percentage points apart. Cancellations peaked at 6.9% of scheduled stops in Period 1 of 2024-25, against 1.7% over the latest 13 periods.
1 of 3 stations of a similar size in Scotland are more punctual than Drumgelloch on 89.2%. The comparison group includes Livingston North (89.2%), Uphall (88.3%) and Troon (92.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 31,587 | 89.2% | 1.7% |
Operators with their own page for this station are linked to it.
Late train at Drumgelloch? Delay Repay
These operators call at Drumgelloch and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,404 | 87.8% | 1.0% |
| Period 6 of 2026-27 | 2,407 | 91.2% | 2.1% |
| Period 5 of 2026-27 | 2,410 | 90.9% | 2.2% |
| Period 4 of 2026-27 | 2,405 | 91.7% | 3.2% |
| Period 3 of 2026-27 | 2,408 | 92.4% | 1.0% |
| Period 2 of 2026-27 | 2,404 | 90.9% | 1.5% |
| Period 1 of 2026-27 | 2,763 | 90.7% | 1.3% |
| Period 13 of 2025-26 | 2,646 | 90.7% | 1.4% |
| Period 12 of 2025-26 | 2,404 | 89.7% | 2.4% |
| Period 11 of 2025-26 | 2,404 | 89.7% | 0.8% |
| Period 10 of 2025-26 | 2,124 | 86.7% | 1.2% |
| Period 9 of 2025-26 | 2,404 | 82.1% | 2.1% |
| Period 8 of 2025-26 | 2,404 | 84.5% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Livingston North | 31,779 | 89.2% | 2.4% |
| Uphall | 31,779 | 88.3% | 2.4% |
| Troon | 32,451 | 92.9% | 1.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out