Dinsdale
DNDNorth EastManaged by Northern Trains
How this station is performing
Dinsdale had 23,161 scheduled stops to Period 7 of 2026-27, about 64 a day. 87.6% of recorded arrivals were within three minutes of the timetable and 1.5% of scheduled stops were cancelled.
Dinsdale opened on 10 October 1825. It was moved to the site it uses now on 1 July 1887. Of the 5 stations nearest to it with a known opening date, Dinsdale is the oldest; the next oldest, North Road (Darlington), dates from 1825.
The nearest stations to Dinsdale are Teesside Airport (2.7 km east), Darlington (5.2 km west), North Road (Darlington) (6.1 km north-west), Allens West (6.9 km east) and Eaglescliffe (7.8 km east). 6 stations lie within 10 km in all. Of the five, Allens West is the most punctual at 88.8% and Darlington the least at 74.7%, with Dinsdale on 87.6%.
Across the whole run of data, the weakest four-week period for Dinsdale was Period 8 of 2023-24, at 79.6%, some time before the latest year. The strongest was Period 3 of 2026-27, at 91.5%, and the two are 11.9 percentage points apart. Cancellations peaked at 13.3% of scheduled stops in Period 7 of 2024-25, against 1.5% over the latest 13 periods.
Northern is the only operator serving Dinsdale. Here it manages 87.6% within three minutes, 9.0 percentage points better than its 78.6% across its whole network.
2 of 3 stations of a similar size in North East are more punctual than Dinsdale on 87.6%. The comparison group includes Allens West (88.8%), Berwick-upon-Tweed (68.7%) and Saltburn (89.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 23,161 | 87.6% | 1.5% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,810 | 90.7% | 1.2% |
| Period 6 of 2026-27 | 1,812 | 91.0% | 2.5% |
| Period 5 of 2026-27 | 1,812 | 83.5% | 1.2% |
| Period 4 of 2026-27 | 1,808 | 89.1% | 1.7% |
| Period 3 of 2026-27 | 1,812 | 91.5% | 1.0% |
| Period 2 of 2026-27 | 1,803 | 86.8% | 1.5% |
| Period 1 of 2026-27 | 2,088 | 86.7% | 0.6% |
| Period 13 of 2025-26 | 1,770 | 87.6% | 1.8% |
| Period 12 of 2025-26 | 1,812 | 89.1% | 0.6% |
| Period 11 of 2025-26 | 1,812 | 90.1% | 1.0% |
| Period 10 of 2025-26 | 1,555 | 85.8% | 4.0% |
| Period 9 of 2025-26 | 1,568 | 83.6% | 1.3% |
| Period 8 of 2025-26 | 1,699 | 82.9% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Allens West | 23,161 | 88.8% | 1.5% |
| Berwick-upon-Tweed | 23,681 | 68.7% | 2.2% |
| Saltburn | 23,994 | 89.2% | 4.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out