Dinas Powys
DNSWalesManaged by TfW Rail
How this station is performing
Dinas Powys had 43,451 scheduled stops to Period 7 of 2026-27, about 119 a day. 89.4% of recorded arrivals were within three minutes of the timetable and 3.3% of scheduled stops were cancelled.
Dinas Powys opened on 20 December 1888, 138 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Penarth is the oldest (1878) and Eastbrook the newest (1986), with Dinas Powys in between.
The nearest stations to Dinas Powys are Eastbrook (1.1 km north-east), Cogan (2.7 km north-east), Dingle Road (2.9 km east), Cadoxton (3.0 km south-west) and Penarth (3.1 km east). 24 stations lie within 10 km in all. Of the five, Penarth is the most punctual at 96.1% and Eastbrook the least at 88.8%, with Dinas Powys on 89.4%.
Dinas Powys takes its name from a Village called Dinas Powys, home to about 7,892 people, and the station stands 0.5 km from its centre.
Dinas Powys has edged up: 89.4% of stops came within three minutes of the timetable in the latest 13 periods, 4.7 percentage points better than the 84.7% of the 13 before. Cancellations held steady at 3.3% of scheduled stops, against 3.1% before.
Compared with 3 stations of a similar size in Wales, Dinas Powys is the least punctual, at 89.4%. All of them are ahead, including Barry Docks (89.8%), Cadoxton (90.3%) and Cogan (89.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 43,451 | 89.4% | 3.3% |
Operators with their own page for this station are linked to it.
Late train at Dinas Powys? Delay Repay
These operators call at Dinas Powys and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,201 | 90.4% | 2.9% |
| Period 6 of 2026-27 | 3,290 | 89.0% | 1.5% |
| Period 5 of 2026-27 | 3,374 | 87.4% | 4.9% |
| Period 4 of 2026-27 | 3,283 | 86.5% | 4.2% |
| Period 3 of 2026-27 | 3,295 | 88.4% | 2.5% |
| Period 2 of 2026-27 | 3,352 | 91.5% | 4.6% |
| Period 1 of 2026-27 | 3,836 | 92.5% | 2.8% |
| Period 13 of 2025-26 | 3,642 | 93.0% | 4.0% |
| Period 12 of 2025-26 | 3,330 | 92.8% | 1.7% |
| Period 11 of 2025-26 | 3,239 | 92.7% | 3.3% |
| Period 10 of 2025-26 | 2,966 | 86.4% | 3.7% |
| Period 9 of 2025-26 | 3,326 | 83.9% | 4.3% |
| Period 8 of 2025-26 | 3,317 | 86.5% | 2.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Barry Docks | 43,451 | 89.8% | 3.2% |
| Cadoxton | 43,451 | 90.3% | 3.2% |
| Cogan | 43,451 | 89.8% | 3.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out