CrossCountry at Derby
How this operator is doing here
CrossCountry had 37,561 scheduled stops at Derby in the 13 periods to Period 7 of 2026-27, 43% of the station's total. 65.0% of recorded arrivals came within three minutes and 5.4% of stops were cancelled.
CrossCountry trains at Derby also serve Spondon (3.5 km east, 83.7% on time, 5.3% cancelled), Willington (9.8 km south-west, 72.2% on time, 6.5% cancelled), Long Eaton (12.3 km east, 72.2% on time, 7.5% cancelled), Attenborough (15.5 km east, 90.8% on time, 5.8% cancelled), Beeston (17.1 km east, 75.5% on time, 7.3% cancelled) and Burton-on-Trent (17.2 km south-west, 68.9% on time, 5.5% cancelled), which are the stations on its network closest to Derby.
Within 30 km of here, CrossCountry runs best at Nottingham, 21.6 km east (79.7%), and worst at Burton-on-Trent, 17.2 km south-west (68.9%).
The busiest CrossCountry station within 30 km of Derby is Burton-on-Trent, 17.2 km south-west, with about 76 scheduled stops a day.
Of the 2 operators with enough records at Derby, CrossCountry is the least punctual, at 65.0%.
CrossCountry at Derby has slipped a little, from 69.3% within three minutes in the previous 13 periods to 65.0% in the latest 13, a fall of 4.3 percentage points. Cancellations rose to 5.4% of scheduled stops from 4.9%, which is 0.5 percentage points more.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,973 | 64.2% | 4.7% |
| Period 6 of 2026-27 | 2,929 | 61.4% | 5.9% |
| Period 5 of 2026-27 | 2,918 | 60.2% | 3.5% |
| Period 4 of 2026-27 | 2,811 | 58.7% | 5.3% |
| Period 3 of 2026-27 | 2,821 | 61.5% | 7.0% |
| Period 2 of 2026-27 | 2,898 | 62.5% | 7.8% |
| Period 1 of 2026-27 | 3,358 | 69.9% | 3.3% |
| Period 13 of 2025-26 | 3,135 | 69.6% | 4.0% |
| Period 12 of 2025-26 | 2,841 | 71.7% | 2.6% |
| Period 11 of 2025-26 | 2,843 | 76.3% | 4.9% |
| Period 10 of 2025-26 | 2,512 | 66.9% | 10.9% |
| Period 9 of 2025-26 | 2,820 | 56.7% | 6.7% |
| Period 8 of 2025-26 | 2,702 | 64.5% | 4.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Derby
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 50,196 | 72.2% | 2.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out