East Midlands Railway at Derby
All trains at DerbyEast Midlands Railway across BritainEast Midlands
How this operator is doing here
East Midlands Railway had 50,196 scheduled stops at Derby in the 13 periods to Period 7 of 2026-27, 57% of the station's total. 72.2% of recorded arrivals came within three minutes and 2.8% of stops were cancelled.
East Midlands Railway trains at Derby also serve Peartree (2.2 km south, 74.3% on time, 2.9% cancelled), Spondon (3.5 km east, 80.2% on time, 1.8% cancelled), Duffield (8.1 km north, 82.9% on time, 1.9% cancelled), Belper (12.1 km north, 82.5% on time, 2.0% cancelled), Long Eaton (12.3 km east, 71.1% on time, 2.7% cancelled) and Ilkeston (13.2 km north-east, 66.6% on time, 3.5% cancelled), which are the stations on its network closest to Derby.
Within 30 km of here, East Midlands Railway runs best at Newstead, 23.5 km north-east (88.2%), and worst at Alfreton, 21.5 km north (63.1%).
The busiest East Midlands Railway station within 30 km of Derby is Nottingham, 21.6 km east, with about 276 scheduled stops a day.
Of the 2 operators with enough records at Derby, East Midlands Railway is the most punctual, at 72.2%.
Over three full railway years East Midlands Railway at Derby has improved each time, from 69.7% within three minutes in 2023-24 to 71.5% in 2024-25 and 74.4% in 2025-26.
Period by period
See how East Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,836 | 73.0% | 2.2% |
| Period 6 of 2026-27 | 3,725 | 72.8% | 2.4% |
| Period 5 of 2026-27 | 3,611 | 70.0% | 3.7% |
| Period 4 of 2026-27 | 3,717 | 69.9% | 5.1% |
| Period 3 of 2026-27 | 3,580 | 67.4% | 4.9% |
| Period 2 of 2026-27 | 3,893 | 71.3% | 3.8% |
| Period 1 of 2026-27 | 4,474 | 73.2% | 2.1% |
| Period 13 of 2025-26 | 4,313 | 72.6% | 3.2% |
| Period 12 of 2025-26 | 3,930 | 75.4% | 2.7% |
| Period 11 of 2025-26 | 3,877 | 79.1% | 2.4% |
| Period 10 of 2025-26 | 3,553 | 76.5% | 1.6% |
| Period 9 of 2025-26 | 3,827 | 65.5% | 2.0% |
| Period 8 of 2025-26 | 3,860 | 70.8% | 0.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Derby
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| CrossCountry | 37,561 | 65.0% | 5.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out