Southeastern at Deptford
How this operator is doing here
Southeastern had 34,490 scheduled stops at Deptford in the 13 periods to Period 7 of 2026-27, 61% of the station's total. 88.0% of recorded arrivals came within three minutes and 1.9% of stops were cancelled.
Southeastern trains at Deptford also serve New Cross (0.5 km south-west, 90.1% on time, 1.5% cancelled), Greenwich (0.8 km east, 89.5% on time, 1.8% cancelled), St Johns (London) (1.1 km south, 91.9% on time, 1.5% cancelled), Lewisham (1.7 km south-east, 87.0% on time, 1.5% cancelled), Maze Hill (2.2 km east, 90.8% on time, 1.8% cancelled) and Nunhead (2.2 km south-west, 86.1% on time, 2.2% cancelled), which are the stations on its network closest to Deptford.
Within 30 km of here, Southeastern runs best at Sundridge Park, 8.0 km south-east (99.4%), and worst at Sevenoaks, 26.8 km south-east (72.3%).
The busiest Southeastern station within 30 km of Deptford is London Bridge, 5.0 km north-west, with about 912 scheduled stops a day.
Of the 2 operators with enough records at Deptford, Southeastern is the most punctual, at 88.0%.
For Southeastern, Deptford is the 48th best of 173 ranked stations. Its 88.0% here is 3.8 percentage points above the 84.2% across the whole network.
Southeastern at Deptford has not moved in one direction over three full railway years: 85.9% within three minutes in 2023-24, 90.9% in 2024-25 and 88.7% in 2025-26.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,740 | 88.1% | 0.9% |
| Period 6 of 2026-27 | 2,648 | 89.1% | 0.8% |
| Period 5 of 2026-27 | 2,608 | 89.6% | 2.4% |
| Period 4 of 2026-27 | 2,608 | 88.5% | 2.1% |
| Period 3 of 2026-27 | 2,374 | 85.5% | 4.5% |
| Period 2 of 2026-27 | 2,536 | 88.0% | 4.3% |
| Period 1 of 2026-27 | 3,081 | 88.0% | 1.5% |
| Period 13 of 2025-26 | 3,010 | 87.4% | 1.4% |
| Period 12 of 2025-26 | 2,665 | 88.0% | 1.6% |
| Period 11 of 2025-26 | 2,663 | 90.0% | 1.5% |
| Period 10 of 2025-26 | 2,306 | 88.9% | 0.8% |
| Period 9 of 2025-26 | 2,589 | 85.7% | 1.3% |
| Period 8 of 2025-26 | 2,662 | 86.6% | 2.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Deptford
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 21,758 | 84.1% | 6.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out