GTR at Deptford
How this operator is doing here
GTR had 21,758 scheduled stops at Deptford in the 13 periods to Period 7 of 2026-27, 39% of the station's total. 84.1% of recorded arrivals came within three minutes and 6.8% of stops were cancelled.
GTR trains at Deptford also serve Greenwich (0.8 km east, 81.9% on time, 6.7% cancelled), New Cross Gate (1.0 km south-west, 92.9% on time, 3.7% cancelled), Lewisham (1.7 km south-east, 90.9% on time, 1.0% cancelled), Brockley (1.8 km south-west, 94.1% on time, 3.7% cancelled), South Bermondsey (2.1 km north-west, 94.1% on time, 2.5% cancelled) and Maze Hill (2.2 km east, 82.5% on time, 6.7% cancelled), which are the stations on its network closest to Deptford.
Within 30 km of here, GTR runs best at Beckenham Junction, 7.5 km south (98.1%), and worst at Kenley, 17.9 km south (66.9%).
The busiest GTR station within 30 km of Deptford is East Croydon, 12.4 km south, with about 813 scheduled stops a day.
Of the 2 operators with enough records at Deptford, GTR is the least punctual, at 84.1%.
For GTR, Deptford is the 148th best of 307 ranked stations. Its 84.1% here is 1.2 percentage points above the 82.9% across the whole network.
GTR at Deptford has not moved in one direction over three full railway years: 87.3% within three minutes in 2023-24, 84.8% in 2024-25 and 85.4% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,865 | 84.0% | 5.9% |
| Period 6 of 2026-27 | 1,655 | 81.1% | 5.0% |
| Period 5 of 2026-27 | 1,232 | 83.0% | 7.6% |
| Period 4 of 2026-27 | 1,616 | 81.8% | 4.9% |
| Period 3 of 2026-27 | 1,119 | 81.3% | 6.7% |
| Period 2 of 2026-27 | 1,593 | 85.4% | 6.3% |
| Period 1 of 2026-27 | 1,944 | 88.4% | 5.0% |
| Period 13 of 2025-26 | 1,998 | 86.5% | 2.7% |
| Period 12 of 2025-26 | 1,737 | 84.2% | 8.1% |
| Period 11 of 2025-26 | 1,797 | 84.6% | 8.7% |
| Period 10 of 2025-26 | 1,599 | 86.8% | 9.8% |
| Period 9 of 2025-26 | 1,837 | 82.2% | 10.6% |
| Period 8 of 2025-26 | 1,766 | 81.3% | 7.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Deptford
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 34,490 | 88.0% | 1.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out