Delamere
DLMNorth WestManaged by Northern Trains
How this station is performing
Delamere had 12,636 scheduled stops to Period 7 of 2026-27, about 35 a day. 87.0% of recorded arrivals were within three minutes of the timetable and 2.5% of scheduled stops were cancelled.
Delamere opened on 22 June 1870, 156 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Delamere is the newest; the oldest, Acton Bridge (Cheshire), opened in 1837.
The nearest stations to Delamere are Mouldsworth (4.4 km west), Cuddington (4.6 km east), Acton Bridge (Cheshire) (5.9 km north-east), Hartford (Cheshire) (7.6 km east) and Frodsham (8.4 km north-west). 7 stations lie within 10 km in all. At 87.0%, Delamere is more punctual than every one of them; the best of the five, Cuddington, manages 83.2%.
Delamere takes its name from a Village called Delamere, home to about 1,028 people, and the station stands 1.3 km from its centre.
Across the whole run of data, the weakest four-week period for Delamere was Period 9 of 2023-24, at 72.0%, some time before the latest year. The strongest was Period 12 of 2025-26, at 93.7%, and the two are 21.7 percentage points apart. Cancellations peaked at 14.9% of scheduled stops in Period 10 of 2024-25, against 2.5% over the latest 13 periods.
1 of 3 stations of a similar size in North West are more punctual than Delamere on 87.0%. The comparison group includes Cuddington (83.2%), Church and Oswaldtwistle (81.4%) and Dalston (Cumbria) (93.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 12,636 | 87.0% | 2.5% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 972 | 85.5% | 2.4% |
| Period 6 of 2026-27 | 980 | 85.8% | 1.7% |
| Period 5 of 2026-27 | 958 | 85.3% | 1.5% |
| Period 4 of 2026-27 | 972 | 83.2% | 3.8% |
| Period 3 of 2026-27 | 976 | 86.5% | 1.0% |
| Period 2 of 2026-27 | 968 | 89.3% | 0.9% |
| Period 1 of 2026-27 | 1,120 | 92.5% | 4.6% |
| Period 13 of 2025-26 | 1,064 | 92.1% | 1.1% |
| Period 12 of 2025-26 | 828 | 93.7% | 1.0% |
| Period 11 of 2025-26 | 969 | 86.1% | 3.2% |
| Period 10 of 2025-26 | 890 | 77.2% | 5.8% |
| Period 9 of 2025-26 | 971 | 85.7% | 3.6% |
| Period 8 of 2025-26 | 968 | 86.7% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Cuddington | 12,636 | 83.2% | 2.5% |
| Church and Oswaldtwistle | 12,635 | 81.4% | 3.8% |
| Dalston (Cumbria) | 12,627 | 93.4% | 3.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out