Dalston (Cumbria)
DLSNorth WestManaged by Northern Trains
How this station is performing
Dalston (Cumbria) had 12,627 scheduled stops to Period 7 of 2026-27, about 35 a day. 93.4% of recorded arrivals were within three minutes of the timetable and 3.0% of scheduled stops were cancelled.
Dalston (Cumbria) opened on 10 May 1843, 183 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Wetheral is the oldest (1836) and Armathwaite the newest (1876), with Dalston (Cumbria) in between.
The nearest stations to Dalston (Cumbria) are Carlisle (6.1 km north-east), Wetheral (10.9 km north-east), Wigton (11.4 km west), Armathwaite (14.5 km east) and Gretna Green (17.9 km north). 1 stations lie within 10 km in all. Of the five, Wigton is the most punctual at 93.9% and Carlisle the least at 74.7%, with Dalston (Cumbria) on 93.4%.
Dalston (Cumbria) is named after Dalston, a Village, home to about 2,794 people, but the station stands 0.4 km from its centre.
Dalston (Cumbria) improved sharply over the past year. In the latest 13 periods 93.4% of stops came within three minutes of the timetable, up 13.6 percentage points from 79.8% in the 13 before. Cancellations fell to 3.0% of scheduled stops from 4.6%, which is 1.6 percentage points fewer.
Compared with 3 stations of a similar size in North West, Dalston (Cumbria) is the most punctual, at 93.4%. The comparison group includes Church and Oswaldtwistle (81.4%), Cuddington (83.2%) and Delamere (87.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 12,627 | 93.4% | 3.0% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 980 | 94.1% | 2.7% |
| Period 6 of 2026-27 | 980 | 94.1% | 1.4% |
| Period 5 of 2026-27 | 980 | 93.6% | 1.4% |
| Period 4 of 2026-27 | 980 | 95.1% | 0.6% |
| Period 3 of 2026-27 | 980 | 94.9% | 0.7% |
| Period 2 of 2026-27 | 980 | 91.1% | 2.4% |
| Period 1 of 2026-27 | 1,127 | 93.4% | 2.2% |
| Period 13 of 2025-26 | 1,054 | 92.4% | 4.6% |
| Period 12 of 2025-26 | 974 | 92.3% | 1.6% |
| Period 11 of 2025-26 | 930 | 94.9% | 1.6% |
| Period 10 of 2025-26 | 804 | 93.8% | 7.2% |
| Period 9 of 2025-26 | 902 | 91.4% | 8.3% |
| Period 8 of 2025-26 | 956 | 92.6% | 5.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Church and Oswaldtwistle | 12,635 | 81.4% | 3.8% |
| Cuddington | 12,636 | 83.2% | 2.5% |
| Delamere | 12,636 | 87.0% | 2.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out