Cuddington
CUDNorth WestManaged by Northern Trains
How this station is performing
Cuddington has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 12,636 scheduled stops, about 35 a day. In those periods 83.2% of stops arrived within three minutes of the timetable and 2.5% of scheduled stops were cancelled.
Cuddington opened on 22 June 1870, 156 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Cuddington is the newest; the oldest, Acton Bridge (Cheshire), opened in 1837.
The nearest stations to Cuddington are Acton Bridge (Cheshire) (2.9 km north), Hartford (Cheshire) (3.0 km east), Greenbank (4.5 km east), Delamere (4.6 km west) and Northwich (7.2 km east). 8 stations lie within 10 km in all. Of the five, Delamere is the most punctual at 87.0% and Acton Bridge (Cheshire) the least at 61.3%, with Cuddington on 83.2%.
Cuddington is one of 3 stations named after a Village called Cuddington, home to about 6,199 people; this one stands 0.1 km from its centre.
2 of 3 stations of a similar size in North West are more punctual than Cuddington on 83.2%. The comparison group includes Delamere (87.0%), Church and Oswaldtwistle (81.4%) and Dalston (Cumbria) (93.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 12,636 | 83.2% | 2.5% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 972 | 82.2% | 2.4% |
| Period 6 of 2026-27 | 980 | 84.2% | 1.7% |
| Period 5 of 2026-27 | 958 | 81.8% | 1.5% |
| Period 4 of 2026-27 | 972 | 80.0% | 3.8% |
| Period 3 of 2026-27 | 976 | 84.9% | 1.1% |
| Period 2 of 2026-27 | 968 | 80.8% | 0.9% |
| Period 1 of 2026-27 | 1,120 | – | 4.6% |
| Period 13 of 2025-26 | 1,064 | 89.8% | 1.1% |
| Period 12 of 2025-26 | 828 | 92.1% | 1.0% |
| Period 11 of 2025-26 | 969 | 82.3% | 3.2% |
| Period 10 of 2025-26 | 890 | 73.5% | 5.8% |
| Period 9 of 2025-26 | 971 | 80.1% | 3.6% |
| Period 8 of 2025-26 | 968 | 83.4% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Delamere | 12,636 | 87.0% | 2.5% |
| Church and Oswaldtwistle | 12,635 | 81.4% | 3.8% |
| Dalston (Cumbria) | 12,627 | 93.4% | 3.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out