Deansgate had 58,122 scheduled stops to Period 7 of 2026-27, about 160 a day. 59.6% of recorded arrivals were within three minutes of the timetable and 3.7% of scheduled stops were cancelled.
Deansgate opened on 20 July 1849, 177 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Salford Central is the oldest (1838) and Salford Crescent the newest (1987), with Deansgate in between.
The nearest stations to Deansgate are Manchester Oxford Road (0.6 km east), Salford Central (1.0 km north), Manchester Piccadilly (1.4 km east), Manchester Victoria (1.6 km north) and Salford Crescent (2.1 km north-west). 34 stations lie within 10 km in all. Of the five, Salford Central is the most punctual at 78.5% and Manchester Oxford Road the least at 55.5%, with Deansgate on 59.6%.
For Deansgate, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 44.7% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 77.7%, which is 33.0 percentage points higher. Cancellations peaked at 11.8% of scheduled stops in Period 10 of 2024-25, against 3.7% over the latest 13 periods.
Compared with 3 stations of a similar size in North West, Deansgate is the least punctual, at 59.6%. All of them are ahead, including Blackburn (76.0%), Hunts Cross (89.1%) and Wilmslow (72.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 58,121 | 59.6% | 3.7% |
| TransPennine Express | 1 | – | – |
Operators with their own page for this station are linked to it.
Late train at Deansgate? Delay Repay
These operators call at Deansgate and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,479 | 59.5% | 2.9% |
| Period 6 of 2026-27 | 4,522 | 60.7% | 2.7% |
| Period 5 of 2026-27 | 4,500 | 62.1% | 5.5% |
| Period 4 of 2026-27 | 4,496 | 60.4% | 3.6% |
| Period 3 of 2026-27 | 4,244 | 57.0% | 4.1% |
| Period 2 of 2026-27 | 4,524 | 64.1% | 2.8% |
| Period 1 of 2026-27 | 5,010 | 62.8% | 2.5% |
| Period 13 of 2025-26 | 4,929 | 63.2% | 5.8% |
| Period 12 of 2025-26 | 4,567 | 65.8% | 2.8% |
| Period 11 of 2025-26 | 4,508 | 60.6% | 2.1% |
| Period 10 of 2025-26 | 3,832 | 57.3% | 6.2% |
| Period 9 of 2025-26 | 4,092 | 44.7% | 3.5% |
| Period 8 of 2025-26 | 4,419 | 54.3% | 3.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Blackburn | 58,510 | 76.0% | 3.3% |
| Hunts Cross | 56,369 | 89.1% | 2.4% |
| Wilmslow | 55,192 | 72.6% | 3.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out